Geschreven door studenten die geslaagd zijn Direct beschikbaar na je betaling Online lezen of als PDF Verkeerd document? Gratis ruilen 4,6 TrustPilot
logo-home
Tentamen (uitwerkingen)

OPSM 4820 EXAM 2 QUESTIONS COMPLETE WITH VERIFIED ANSWERS

Beoordeling
-
Verkocht
-
Pagina's
8
Cijfer
A+
Geüpload op
22-04-2026
Geschreven in
2025/2026

OPSM 4820 EXAM 2 QUESTIONS COMPLETE WITH VERIFIED ANSWERS /. For companies assembling end items from components produced in batch manufacturing processes, ________ is central to the development of detailed plans for part needs. - Answer-MRP /.Facility with time-phased planning and the associated time-phased records is basic to understanding many other aspects of the ________ system. - Answer-MPC /.The _____ data make it possible to construct a time-phased requirement record for any part number. The data can also be used as input to the detailed capacity planning models. - Answer-MRP /.An ______ system serves a central role in material planning and control. It translates the overall plans for production into the detailed individual steps necessary to accomplish those plans. It provides information for developing capacity plans, and it links to the systems that actually get the production accomplished. - Answer-MRP /.At the heart of the ____ system is a universal representation of the status and plans for any single item (part number), whether raw material, component part, or finished good. - Answer-MPC /.The anticipated future usage of or demand for the item during each period. - Answer-gross requirements /.Existing replenishment orders for the item due in at the beginning of each period. - Answer-scheduled receipts /.The current and projected inventory status for the item at the end of each period. - Answer-projected available balance /.Planned replenishment orders for the item at the beginning of each period. - Answer-planned order releases /._________ is the process of translating product requirements into component part requirements, taking existing inventories and scheduled receipts into account. - Answer-Explosion /.The remaining planned order releases for the top handle assembly exactly meet the net requirements in the remaining periods, offset for the lead time. The ordering policy used for these items is called _____________ . - Answer-lot-for-lot sizing /.Processing all of the records in one computer run is called ____________ . This signifies that all part number records are completely reconstructed each time the records are processed. - Answer-regeneration /.A logical response to the pressure for more frequent processing is to reduce the required amount of calculation by processing only the records affected by the changes. An alternative to ____________ is the net change approach. With net change, only those items that are affected by the new or changed information are reprocessed. - Answer-regeneration /.__________ system specifies the exact release and due dates for each requirement, scheduled receipt, and planned order. - Answer-A bucketless MRP /.___________ is a buffer of stock above and beyond that needed to satisfy the gross requirements. - Answer-Safety stock /.__________ tends to be used in MRP systems where uncertainty about quantities is the problem (e.g., where some small amount of scrap, spare part demand, or other unplanned usage is a frequent occurrence). - Answer-Safety stock /.____________ tends to be used when the major uncertainty is the timing rather than the quantity. - Answer-Safety lead time /._________ all the gross requirements for a part to all the planned order releases or other sources of demand that created the requirements. - Answer-Pegging relates /.____________ demand must be included in the MRP record if the material requirements are not to be understated. The ____________ demand is typically based on a forecast and is added directly into the gross requirements for the part. - Answer-Service part /.The persons most directly involved with the MRP system outputs are __________ . - Answer-planners /.___________ is the process of releasing orders to the shop or to vendors (purchase orders). This process is prompted by MRP when a planned order release is in the current time period, - Answer-Order launching /._______________ involves an availability check for the necessary component or components. - Answer-allocation /.After availability checking and allocation, _____________ are typically created and sent to the stockroom. The ______________ calls for a specified amount of some part number to be removed from some inventory location, on some shop order, to be delivered to a particular department or location. - Answer-picking tickets

Meer zien Lees minder
Instelling
OPSM 4820
Vak
OPSM 4820

Voorbeeld van de inhoud

OPSM 4820 EXAM 2 QUESTIONS COMPLETE WITH
VERIFIED ANSWERS


/. For companies assembling end items from components produced in batch
manufacturing processes, ________ is central to the development of detailed plans for
part needs. - Answer-MRP

/.Facility with time-phased planning and the associated time-phased records is basic to
understanding many other aspects of the ________ system. - Answer-MPC

/.The _____ data make it possible to construct a time-phased requirement record for
any part number. The data can also be used as input to the detailed capacity planning
models. - Answer-MRP

/.An ______ system serves a central role in material planning and control. It translates
the overall plans for production into the detailed individual steps necessary to
accomplish those plans. It provides information for developing capacity plans, and it
links to the systems that actually get the production accomplished. - Answer-MRP

/.At the heart of the ____ system is a universal representation of the status and plans
for any single item (part number), whether raw material, component part, or finished
good. - Answer-MPC

/.The anticipated future usage of or demand for the item during each period. - Answer-
gross requirements

/.Existing replenishment orders for the item due in at the beginning of each period. -
Answer-scheduled receipts

/.The current and projected inventory status for the item at the end of each period. -
Answer-projected available balance

/.Planned replenishment orders for the item at the beginning of each period. - Answer-
planned order releases

/._________ is the process of translating product requirements into component part
requirements, taking existing inventories and scheduled receipts into account. - Answer-
Explosion

/.The remaining planned order releases for the top handle assembly exactly meet the
net requirements in the remaining periods, offset for the lead time. The ordering policy
used for these items is called _____________ . - Answer-lot-for-lot sizing

, /.Processing all of the records in one computer run is called ____________ . This
signifies that all part number records are completely reconstructed each time the
records are processed. - Answer-regeneration

/.A logical response to the pressure for more frequent processing is to reduce the
required amount of calculation by processing only the records affected by the changes.
An alternative to ____________ is the net change approach. With net change, only
those items that are affected by the new or changed information are reprocessed. -
Answer-regeneration

/.__________ system specifies the exact release and due dates for each requirement,
scheduled receipt, and planned order. - Answer-A bucketless MRP

/.___________ is a buffer of stock above and beyond that needed to satisfy the gross
requirements. - Answer-Safety stock

/.__________ tends to be used in MRP systems where uncertainty about quantities is
the problem (e.g., where some small amount of scrap, spare part demand, or other
unplanned usage is a frequent occurrence). - Answer-Safety stock

/.____________ tends to be used when the major uncertainty is the timing rather than
the quantity. - Answer-Safety lead time

/._________ all the gross requirements for a part to all the planned order releases or
other sources of demand that created the requirements. - Answer-Pegging relates

/.____________ demand must be included in the MRP record if the material
requirements are not to be understated. The ____________ demand is typically based
on a forecast and is added directly into the gross requirements for the part. - Answer-
Service part

/.The persons most directly involved with the MRP system outputs are __________ . -
Answer-planners

/.___________ is the process of releasing orders to the shop or to vendors (purchase
orders). This process is prompted by MRP when a planned order release is in the
current time period, - Answer-Order launching

/._______________ involves an availability check for the necessary component or
components. - Answer-allocation

/.After availability checking and allocation, _____________ are typically created and
sent to the stockroom. The ______________ calls for a specified amount of some part
number to be removed from some inventory location, on some shop order, to be
delivered to a particular department or location. - Answer-picking tickets

Geschreven voor

Instelling
OPSM 4820
Vak
OPSM 4820

Documentinformatie

Geüpload op
22 april 2026
Aantal pagina's
8
Geschreven in
2025/2026
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

$14.99
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
kartelodoc Harvard University
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
143
Lid sinds
1 jaar
Aantal volgers
7
Documenten
8353
Laatst verkocht
2 weken geleden

Our store offers a wide selection of materials on various subjects and difficulty levels, created by experienced teachers. We specialize on NURSING,WGU,ACLS USMLE,TNCC,PMHNP,ATI and other major courses, Updated Exam, Study Guides and Test banks. If you don't find any document you are looking for in this store contact us and we will fetch it for you in minutes, we love impressing our clients with our quality work and we are very punctual on deadlines. Please go through the sets description appropriately before any purchase and leave a review after purchasing so as to make sure our customers are 100% satisfied. I WISH YOU SUCCESS IN YOUR EDUCATION JOURNEY

Lees meer Lees minder
3.3

25 beoordelingen

5
8
4
2
3
8
2
3
1
4

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen