Questions With All Correct Answers
Verified Answers 2025 Marking
Scheme New Update
Pushback trigger - Answer- When ground crew is ready for pushback or engine start at
gate
Once pushback clearance is received-CA - Answer- Beacon on, brakes released, nose
well steering is off-cleared to push
Engine start trigger? - Answer- When cleared and ready to start
After Start Procedure - Answer- When wave off received (flight control page)
Taxi procedure - Answer- After pushback when workload and conditions permit
Delayed after start procedure - Answer- Ensure proper engine warm up 2 min
Before takeoff procedure - Answer- When number 3 for departure or 5 min
After takeoff procedure - Answer- After flaps are selected up, and when workload and
conditions permit
Climb Procedure - Answer- Approaching fl180
Cruise procedure - Answer- After reaching top of climb
Descent Procedure - Answer- At TOD or approx 15 min prior to landing
Approach and climb procedure - Answer- Flying through 10,000 AFE
Landing Procedure - Answer- Approx 3 miles from FAF or abeam Touchdown point
After landing procedure - Answer- When clear of runway and workload and conditions
permit
Shutdown Procedure single engine taxi - Answer- After engine 2 min cooldown
requirements have been met and single engine taxi is desired
Cowl ice off? - Answer- 30-60 seconds or 3 airplane lengths from stopping at the gate