Q1: Which of the following is a primary objective of quality control in manufacturing?
A. Maximizing production speed
B. Minimizing material costs
C. Ensuring product conformance to specifications
D. Reducing workforce size
Correct Answer: C
Rationale: Correct because quality control focuses on meeting specifications to satisfy
customer requirements.
Q2: In a control chart, which pattern indicates a process shift?
A. Random points within control limits
B. Seven points in a row on one side of the centerline
C. A sudden change in the process average
D. Consistent points near the upper control limit
Correct Answer: C
Rationale: This matches the definition of a process shift in SPC, requiring investigation.
Q3: What is the purpose of a Pareto chart?
A. To monitor process stability over time
B. To calculate process capability indices
C. To identify the most significant factors contributing to a problem
D. To display the frequency of defects in descending order
Correct Answer: C
Rationale: Correct because a Pareto chart helps prioritize problems by their frequency or
impact.
Q4: Which ISO standard specifies requirements for a quality management system?
A. ISO 14001
B. ISO 45001
C. ISO 9001
D. ISO 27001
, 2
Correct Answer: C
Rationale: Correct because ISO 9001 is the standard for quality management systems.
Q5: What is the formula for calculating the process capability index (Cp)?
A. (USL - LSL) / 3σ
B. (USL - mean) / 3σ
C. (USL - LSL) / 6σ
D. (mean - LSL) / 3σ
Correct Answer: C
Rationale: Correct because Cp is defined as the tolerance width divided by 6 standard
deviations.
Q6: Which type of inspection is performed to prevent defective products from reaching the
customer?
A. Source inspection
B. Final inspection
C. Process inspection
D. Receiving inspection
Correct Answer: B
Rationale: Correct because final inspection occurs before shipment to ensure only
conforming products are delivered.
Q7: What is the upper control limit (UCL) formula for an X-bar chart?
A. X-bar + 3σ
B. X-bar + A2 * σ
C. X-bar + A2 * R-bar
D. X-bar + D4 * R-bar
Correct Answer: C
Rationale: Correct because the UCL for X-bar charts uses the average range (R-bar) and
the A2 constant.
Q8: Which tool is used to identify potential root causes of a problem?
A. Histogram
B. Scatter diagram
C. Fishbone diagram
D. Control chart
Correct Answer: C
Rationale: Priority is to brainstorm potential causes using a fishbone diagram before
analyzing data.
Q9: What is the definition of "sampling plan"?
A. A method to inspect every item in a batch
B. A procedure to determine sample size and acceptance criteria