July 1 2005, service techs shall possess or work under someone who
has a current certification indicating he or she has passed the? -
ANSWER--ICC California UST Service Technician Exam
ICC cert must be renewed every? - ANSWER--24 months
Service techs must possess or be employed by a person who has the
appropriate contractor's license unless? - ANSWER--The individual has a
Tank testing license
Service tech is defined by any individual who? - ANSWER--Test UST
monitoring equipment Trouble shoots UST systems Installs UST
monitoring equipment
If the manufacturer training no longer exist, the local agency may? -
ANSWER--Approve comparable alternate training .
UST includes? - ANSWER--Tank and connected piping
,2|Page
What is considered and UST - ANSWER--petroleum storage tank
What UST system meets the requirements for secondary containment?
- ANSWER--Doubled wall tanks
According to title 23; the following piping components if installed after
July 1 1987 must have secondary containment - ANSWER--Pressured
product piping
Considered "pipe" on tanks installed after July 1 2003 - ANSWER--
Pressured product piping and below ground vapor recovery
Under dispenser containment (UDC) was required for all UST systems
by - ANSWER--December 31 2003
System for exchanging gas vapors in a storage tank and product in a
fuel delivery truck - ANSWER--Stage 1 vapor recovery
An approved method for non-visual monitoring for existing UST
systems. - ANSWER--Statistical Inventory Reconciliation (SIR)
ATG must be capable for detecting a release of? - ANSWER--.2 gallons
per hour
,3|Page
Manual inventory reconciliation. - ANSWER--No longer an approved
method for non-visual monitoring on existing UST systems
Automatic line leak detectors installed on underground piping with
secondary containment shall be capable of detecting a leak of ? -
ANSWER--3 gallons per hour at 10 psi
ATG should be programmed to test the tank? - ANSWER--At least
monthly
According to PEI RP 300 a combustible gas can be used to? - ANSWER--
Detect vapor leaks in a vapor recovery system.
According to PEI RP 300. A written scope of work for vapor recovery
installation should include? - ANSWER--Construction plans
Positive shut off overfill protection device must stop the flow of fuel
when the tank is no more then? - ANSWER--95% full
According to EO VR 201 A What could cause a nozzle shut off
mechanism or malfunction? - ANSWER--Depended filter seal damage
According to VR 201 A Breakaway reconnection must be? - ANSWER--
Logged in GDF log
, 4|Page
According to PEI RP 300 the following method of documenting piping
location is NOT to? - ANSWER--Sketch a diagram on the inside cover of
vapor recovery equipment manual
According to PEI RP 300 as built drawing or pictures of the underground
pipping and other components shall be? - ANSWER--Maintained as long
as UST is in service
According to EO VR 101 E maintenance records are required to include?
- ANSWER--Name and designated UST operator.
The Phil-Tite EVR phase 1 system require that vapor vent pipes at any
UST system be - ANSWER--Used with no more than 3 p/v valves
According to EO VR 2010 after installing a new spout assembly in the
Healy 900 nozzle the following test must be conducted? - ANSWER--
Nozzle dispensing shut off test
According to Healy EO VR 201 A a vapor recovery record is to be
maintained by? - ANSWER--Gasoline dispensing facility operator(GDF)
how many feet within a public drinking well require an enhanced leak
detection test - ANSWER--1000 feet