With Accurate Solutions 2025\2026 A+ Grade.
The key goals of planning include all of the following, EXCEPT:
- accurate answers-Restrict private ownership rights
In Florida, which entity has the primary authority for comprehensive
planning?
- accurate answers-County or city planning agency
What do concurrency rules refer to in FS163?
- accurate answers-The requirements for a minimum level of public
infrastructure be available to support growth and development around a
development site.
What term refers to the overall master plan created by the local planning
agency for the city or county?
- accurate answers-Comprehensive plan
The local planning agency has review and approval authority over all of the
following areas EXCEPT:
- accurate answers-property valuation
Which study, performed as part of preparing the comprehensive plan,
examines the existing system of streets, highways, and traffic patterns to
determine the future needs?
- accurate answers-Thoroughfare study
What type of information would typically be reviewed in an economic base
analysis study, when performed in the preparation of a county's
comprehensive plan?
- accurate answers-Types of business and employment within the county
Which of the following businesses would be considered a basic or export
business?
- accurate answers-Manufacturing plant
,What term, used in a future land use plan, refers to the measurement of the
number of people or residential units allowed per unit of land?
- accurate answers-Density
What statement best describes zoning?
- accurate answers-The division of land into separate categories of legally
permitted use.
Zoning regulations are an application of which government authority?
- accurate answers-Police Power
A developer plans to build homes on a 200-acre tract of land where the zoning
limits the lot sizes to a minimum of 8,000 square feet, with 25% of the land
area reserved for streets, sidewalks, and common areas. How many lots in the
tract can be developed?
- accurate answers-816
The owner of a 6,200 sq ft lot wants to build on the property, but zoning
requires a minimum of 6,500 sq ft to obtain a building permit. What action
should the owner take to remedy the situation?
- accurate answers-Request a variance
The zoning board gave permission for a private day care facility to be
constructed in a residential neighborhood, departing from the use in that
neighborhood provided by zoning ordinance. What action did the day care
facility owner most likely take to get permission from the board?
- accurate answers-Request for a special exception
What term refers to a property that predates current zoning and does not
conform to current zoning ordinances?
- accurate answers-Legally nonconforming
What statement best describes a development of regional impact?
- accurate answers-Any planned development that substantially affects the
health, safety, or welfare of the citizens of more than one county.
All of the following are characteristics of a planned unit development (PUD)
EXCEPT:
,- accurate answers-The land is strictly divided into separate areas designated
for different uses
What items would you expect to be addressed in a typical environmental
impact statement EIS?
- accurate answers-Air, water, structures, living organisms, social, cultural,
and economic aspects
Which flood zone area indicates the highest probability of flooding?
- accurate answers-Zone V
Which flood zone area, considered part of the 100-year floodplain, is usually
near a lake, river, stream, or other body of water?
- accurate answers-Zone A
Properties located in which flood zone area would typically have the highest
flood insurance rates?
- accurate answers-Zone V
It is important for real estate licensees to be aware of potential environmental
hazards on behalf of a buyer for all of the following reasons, EXCEPT:
- accurate answers-The loss of commission due to a terminated contract from
a bad inspection report
Why was the CERCLA Superfund enacted?
- accurate answers-To address the issues associated with abandoned
hazardous waste sites.
Which statement provides the basic justification for zoning?
- accurate answers-The inappropriate use of one property may affect the
value of another.
What is the rationale behind government planning of RE development?
- accurate answers-To manage future real estate growth
In Florida, which entity is primarily responsible for establishing and
implementing the roles, processes, and powers of comprehensive planning
and future development?
- accurate answers-Local government and planning agencies
, Which zoning classification typically includes single-family homes, small
multifamily structures, condos, and apartments?
- accurate answers-Residential
Which statement best describes the master plan?
- accurate answers-It serves as a guide for an areas future growth
Which of the following would a church need in order to build in a residential
neighborhood?
- accurate answers-Special exception
What is the purpose of the zoning board of adjustment?
- accurate answers-To grant variances and special exceptions
Which term is used to describe a property use that predates the current
zoning ordinance but is allowed to exist for at least a period of time?
- accurate answers-Legally nonconforming
Which statement best describes a Planned Unit Development?
- accurate answers-A PUD is also referred to as cluster zoning
Which statement is correct with respect to a Development of Regional Impact?
- accurate answers-A DRI is defined as any development that substantially
affects the health, safety or welfare of the citizens of more than one county.
Adequate infrastructure available to support growth and development was
mandated by Florida's Growth Management Act and is specified in which of
the following?
- accurate answers-Concurrency rules
What is the category of business that meets payroll expense by using dollars
generated by persons who live in the immediate vicinity?
- accurate answers-Service
Which of the following would be considered a basic industry when performing
an economic base analysis?
- accurate answers-University