Geschreven door studenten die geslaagd zijn Direct beschikbaar na je betaling Online lezen of als PDF Verkeerd document? Gratis ruilen 4,6 TrustPilot
logo-home
Tentamen (uitwerkingen)

Module 3 UPDATED ACTUAL Questions And Correct Answers

Beoordeling
-
Verkocht
-
Pagina's
5
Cijfer
A+
Geüpload op
25-04-2026
Geschreven in
2025/2026

Module 3 UPDATED ACTUAL Questions And Correct Answers

Instelling
WST
Vak
WST

Voorbeeld van de inhoud

Module 3 UPDATED ACTUAL Questions And Correct Answers
C




Terms in this set (53)



You're in charge of a new construction work site. You 1. Inspect the jobsite and work surfaces for hazards.
must make sure no one gets hurt and that everything 2. Determine that the work surfaces are strong enough to support the workers.
complies with OSHA 3. You find that work must be done near an unprotected edge 11 feet above lower
levels, so workers need fall protection.
4. Have guardrail systems constructed and inspected.
5. Select and inspect the correct personal fall arrest systems, and make sure
workers know how to use them.
6. Begin work and ensure workers follow safe work procedures.


Safe Practices Personal Fall Arrest System - There is a hoisting area without guardrails
Equipment Guards - Workers are working four feet above paving equipment
Fences - An eight-foot-deep hole is hidden by overgrown grasses.
Warning Line and Safety Monitoring Systems - Roofers are working on low-slope
roofs with unprotected sides
Hardhats and Barricades - Workers may be hit by falling tools and materials

, Numbers to Remember 1. Guardrail systems must be able to withstand a force of at least 200 lbs at any
point along the top edge
2. For pipe railings, posts shall be spaced not more than 8 feet apart on centers
3. A safety net's maximum mesh openings must not be longer than 6 inches on any
side
4. Top rails must be 42 inches, plus or minus 3 inches, above the walking/working
level
5. Intermediate members such as balusters, when used between posts, shall not
be more than 19 inches apart
6. Safety net drop-tests must consist of a 400 lbs bag of sand being dropped into
the net.
7. Safety net systems must be no more than 30 feet below the working surface
8. If safety nets are connected together, the connection must be as strong as the
individual nets and not more than 6 inches apart
9. A Personal Fall Arrest System (PFAS) must be rigged so that an employee can
neither free-fall more than 6 feet, nor contact any lower level


Fall Protection Preparation 1. Develop a written fall protection plan and train employees in fall protection
safety
2. Assess potential fall hazards prior to each project
3. Use administrative controls to eliminate hazards by changing or rescheduling
tasks
4. Inspect fall protection equipment to ensure its condition and appropriateness
5. Before starting work, remind employees of specific fall hazards that are present
on the job site
6. Once work has begun, observe workers to ensure that fall protection
equipment is being used properly


Toe boards shall be capable of withstanding, without 50 pounds
failure, a force of at least _ applied in any downward or
outward direction at any point along the toeboard


_____ are used to connect lanyards to D-rings on a body Snap hooks
harness


Warning lines must be flagged at not more than ____ foot 6
intervals with high-visibility materials


A positioning device system is a fall arrest system False


All covers should have any of the following to provide Inlabelled
warning of a hazard except:


Which device is strong but not flexible (absorbs little Synthetic Webbing
force)


Each employee working in a controlled access zone must Safety monitor
be directed to comply with all instructions by the _____

Geschreven voor

Instelling
WST
Vak
WST

Documentinformatie

Geüpload op
25 april 2026
Aantal pagina's
5
Geschreven in
2025/2026
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

$13.99
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
Briwisescore Stanford University
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
18
Lid sinds
2 jaar
Aantal volgers
4
Documenten
6913
Laatst verkocht
3 weken geleden

1.7

3 beoordelingen

5
0
4
0
3
1
2
0
1
2

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen