EICA Mobile Crane & Digger Derrick Exam with precise detailed answers

Instelling
EICA Crane
Vak
EICA Crane

Voorbeeld van de inhoud

2



EICA Mobile Crane & Digger Derrick Exam with precise
|| || || || || || || || ||




detailed answers ||




If not overloaded, the ground bearing pressure of a single outrigger pad can approach a
|| || || || || || || || || || || || || || ||




weight equal to: || ||




85% of the weight of the crane and 100% of the suspended load
|| || || || || || || || || || || ||




If you move a crawler crane from soft ground to harder ground, ground bearing pressure
|| || || || || || || || || || || || || || ||




will

increase

On a crawler crane, ground bearing pressure is greatest when hoisting where?
|| || || || || || || || || || ||




over the corner || ||




If an outrigger pad has 45,000 pounds applied to it and the pad measures 2ft x 2ft how
|| || || || || || || || || || || || || || || || || ||




many psi is it applying to the ground?
|| || || || || || ||




78 PSI ||




How much area would be required for 45,000 pounds to create only 20 PSI?
|| || || || || || || || || || || || ||




2,250 square inches || ||




Why use mats or cribbing?
|| || || ||




To reduce ground bearing pressure
|| || || ||




What is the purpose of placing blocking or pads under the outrigger floats?
|| || || || || || || || || || || ||




Distribute the force over a larger area || || || || || ||




While swinging a heavy load with a crane set up on outriggers and the operator swings over
|| || || || || || || || || || || || || || || ||




one of the outriggers, that outrigger must be able to support
|| || || || || || || || || || ||




85% of the weight of the crane and 100% of the weight of the load
|| || || || || || || || || || || || || ||




What is the first thing an operator should do before traveling under a low pipe rack or
|| || || || || || || || || || || || || || || || ||




obstruction?

post a signalperson to check clearances
|| || || || ||

,2


According to OSHA, when traveling under an energized power line, what is the minimum
|| || || || || || || || || || || || || ||




distance for a line with over 750kv? || || || || || ||




20ft

When a crane is in transit and you are required to pass under 50kV power lines, what is
|| || || || || || || || || || || || || || || || || ||




OSHA's minimum required clearance? || || ||




6 ft (Table T)
|| || ||




If setting up the crane by a ditch or an excavation, you should stay at least what distance
|| || || || || || || || || || || || || || || || || ||




from the edge? || ||




1 ½ times the depth of the excavation
|| || || || || || ||




When working at ground floor level near a cellar wall, the crane's outrigger pads or tracks
|| || || || || || || || || || || || || || || ||




should be placed || ||




at least as far back as the depth of the wall below ground
|| || || || || || || || || || || ||




According to OSHA who is responsible for ensuring proper ground conditions when setting
|| || || || || || || || || || || || ||




up a mobile crane?
|| || ||




The controlling entity
|| ||




What is not a good location for crane set up?
|| || || || || || || || ||




Above utilities ||




What is the best procedure to follow when underground utilities may be present?
|| || || || || || || || || || || ||




Contact local utility company || || ||




While performing a shift inspection on a crane and there is water accumulation around the
|| || || || || || || || || || || || || || ||




outrigger, what must be done? || || || ||




Drained

While operating a boom truck near a reinforced retaining wall, it is recommended to stay
|| || || || || || || || || || || || || || ||




back

A distance equal to the depth
|| || || || ||




What would be a concern when setting up a crane over a sewer or water main?
|| || || || || || || || || || || || || || ||




Weight and vibration from the machine and load
|| || || || || || ||




When setting up a crane in an area that has public access, you should barricade:
|| || || || || || || || || || || || || ||

, 2


the jobsite||




When setting up a crane, what must be barricaded to protect workers?
|| || || || || || || || || || ||




The hazardous areas created by the rotating superstructure
|| || || || || || ||




According to OSHA, what area must be barricaded to prevent employees from entering
|| || || || || || || || || || || ||




accessible areas within the swing radius of the rear of the rotating superstructure of the
|| || || || || || || || || || || || || || ||




crane

The best way to keep people from being injured from the counterweight of the crane is to
|| || || || || || || || || || || || || || || ||




Fence or barricade the swing area of the crane
|| || || || || || || ||




When operating a crane in a tight space, what would be the recommended minimum
|| || || || || || || || || || || || || ||




clearance for the rear swing of the crane? || || || || || || ||




2 ft
||




The load line of the crane you're operating comes into contact with an energized power
|| || || || || || || || || || || || || || ||




line. There's no sign of any other danger, such as fire. In such a situation, you should
|| || || || || || || || || || || || || || || ||




stay in the cab until the lines are de-energized
|| || || || || || || ||




What is the most common cause of death to ground personnel working with cranes
|| || || || || || || || || || || || ||




electrocution

According to ASME B30.5, when working around power lines of more than 750kV, how
|| || || || || || || || || || || || || ||




much clearance is generally required from any part of the crane and its load
|| || || || || || || || || || || || ||




45 ft ||




What is the proper procedure when using an insulating link or a boot near power lines
|| || || || || || || || || || || || || || ||




be sure to maintain the correct allowable distance from the lines
|| || || || || || || || || ||




When working closer than 10 feet on a 12 KV line
|| || || || || || || || || ||




De-energize and ground the circuit. || || || ||




What is the minimum allowable clearance from the crane and power lines under 50kV
|| || || || || || || || || || || || ||




10 ft ||




When working near power lines, when is a dedicated spotter required?
|| || || || || || || || || ||




When the crane can reach within 20 ft. of power lines
|| || || || || || || || || ||

Geschreven voor

Instelling
EICA Crane
Vak
EICA Crane

Documentinformatie

Geüpload op
26 april 2026
Aantal pagina's
30
Geschreven in
2025/2026
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

$20.49
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
Ruiz Liberty University
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
96
Lid sinds
1 jaar
Aantal volgers
1
Documenten
13904
Laatst verkocht
3 weken geleden
Top-Quality Study Materials for Success – Ace Your Exams with Expert Resources!

Access high-quality study materials to help you excel in your exams. Get notes, summaries, and guides tailored to your courses!

3.2

15 beoordelingen

5
4
4
4
3
2
2
1
1
4

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen