PRACTICE TEST
A stream channel diversion can only be constructed on streams with a
drainage area less than _________ acres.
A) 830
B) 725
C) 640
D) 500 - ANSWERS-C) 640
What may be used to construct a grade stabilization structure?
A) Rock
B) Cement
C) Wood
D) All of the above - ANSWERS-D) All of the above
The apron for a storm drain outlet is designed to accommodate the storm
water flow but the minimum length is ______ times the outlet pipe
diameter.
A) 4
B) 5
C) 6
END OF
PAGE
1
, NPDES LEVEL 1A LATEST
PRACTICE TEST
D) 8 - ANSWERS-C) 6
In jurisdictions where there is a local issuing authority (LIA) one NOI is
submitted to the LIA and a second NOI is submitted to whom?
A) Nation Resource Conservation Service (NRCS)
B) Georgia Soil & Water Conservation Commission (GSWCC)
C) Department of Natural Resources (DNR)
D) Environmental Protection Division (EPD) District Office -
ANSWERS-D) Environmental Protection Division (EPD) District
Office
When the entire project has undergone final stabilization the permittee
must notify the EPD with which of the following?
A) A notarized statement of completion
B) A notarized statement of completion and a complete set of
photographs of the project site
C) A Notice of Termination (NOT)
D) An affidavit from the LIA inspector stating that the project plan was
complied with - ANSWERS-C) A Notice of Termination (NOT)