Geschreven door studenten die geslaagd zijn Direct beschikbaar na je betaling Online lezen of als PDF Verkeerd document? Gratis ruilen 4,6 TrustPilot
logo-home
Tentamen (uitwerkingen)

MHIC NASCLA CONTRACTORS COMPLETE EXAM STUDY QUESTIONS WITH VERIFIED ANSWERS

Beoordeling
-
Verkocht
-
Pagina's
27
Cijfer
A+
Geüpload op
27-04-2026
Geschreven in
2025/2026

MHIC NASCLA CONTRACTORS COMPLETE EXAM STUDY QUESTIONS WITH VERIFIED ANSWERS 1. How long does a claimant have to bring a claim against the guaranty fund? - ANSWER 3 years from discovery of the loss or damage 2. How many days does a contractor have to respond in writing to the copy of claim that was sent by the commission? - ANSWER 10 days 3. If a contractor sells personstoos selling or working with the contractor for any reason, the contractor has a responsibility to the state to inform the commission? - ANSWER True 4. All advertising has to provide the identifier "Maryland home improvement commission license no “or "MHIC - ANSWER True 5. What is the maximum penalty the commission may impose upon a contractor, licensed or unlicensed , per violation of these laws - ANSWER $5,000 6. Advertising must be done in a way as to avoid misrepresentating the product, service or Terms of sale so as not to deceive the customer. - ANSWER True 7. An applicant must provide to the commission, a credit report with their application. - ANSWER True 8. How many days does a contractor have to respond to a receipt of a claim from commission? - ANSWER 10 days 9. How many members are there in the Maryland home improvement commission? - ANSWER 9 members 10. Of the 9 members on the commission , how many are experienced in home improvement ? - ANSWER 4 member 11. Does home improvement include work done on an individual condominium unit? - ANSWER Yes 12. Does home improvement include work done on a swimming pool? - ANSWER Yes 13. Does a home improvement contract HAVE to be in writing in order to preserve your lien rights? - ANSWER Yes 14. Contractors who can only contract with a contractor or a subcontractor are: - ANSWER Subcontractors 15. A county or municipality in Maryland _____________ require a contractor to get authorization from an official in that city to be able to contract in that municipality. - ANSWER Cannot 16. If within ________ after the commission gives notice, a contractor on whose amount a claim was paid does not reimburse the fund in full, the commission may sue the contractor for reimbursement. - ANSWER 60 days 17. In addtion to full reimbursement of the fund, a contractor is responsible to pay at least _________interest on the amount to reimburse. - ANSWER 10 % 18. The state can record a lien against any real property owners by the contractor for a debt owed to the fund - ANSWER True 19. If the commission pays a claim from the fund base on the actions or omissions of a contractor, the commission may suspend the contractors license until full reimbursement of the fund plus at least 10%interest - ANSWER True 20. A home improvement contract in compliance with the home improvement laws would include all of the following except - ANSWER Names and license numbers of subcontractors 21. A salesperson may not represent 2 contractors at the same time for the same project. - ANSWER True 22. Can a sales person legally accept money for themselves from the customer - ANSWER No 23. It is against the law for building and permits departments to issue a permit to contractor without the contractors license number. - ANSWER True 24. If a contractor fails to correct violation of the building code within reasonable time period, the county or municipality inspecting the project shall notify the commission - ANSWER True 25. What is the maximum fine for contracting without a license-second offense - ANSWER $5,000 and/or 2 years in jail or both 26. Contractor, jack smith, is not getting along with hector jones , his customer. If he decides not to complete the contract, has jack broken any laws? - ANSWER Yes 27. Can a contractor decide to use material other than specified in the contract documents without getting permission from the owner? - ANSWER No 28. Contractors may not : - ANSWER Lie on their license application Make false promises Misrepresent their service or product 29. A county or municipality in Maryland _______________ regulate the character, performance and quality of home improvement. - ANSWER Can 30. How many members are there in the Maryland Home Improvement Commission? - ANSWER 7 31. Of the 7 members on the Commission, how many are experienced in home improvement? - ANSWER 3 32. What is the term of a member on the Commission? Associated Answers - ANSWER 4 Years 33. How long must a person be a citizen and member of Maryland before they can be appointed to the Commission? - ANSWER 5 years

Meer zien Lees minder
Instelling
MHIC NASCLA CONTRACTORS
Vak
MHIC NASCLA CONTRACTORS

Voorbeeld van de inhoud

MHIC NASCLA CONTRACTORS COMPLETE
EXAM STUDY QUESTIONS WITH VERIFIED
ANSWERS

1. How long does a claimant have to bring a claim against the guaranty fund? -
ANSWER 3 years from discovery of the loss or damage


2. How many days does a contractor have to respond in writing to the copy of
claim that was sent by the commission? - ANSWER 10 days


3. If a contractor sells personstoos selling or working with the contractor for
any reason, the contractor has a responsibility to the state to inform the
commission? - ANSWER True


4. All advertising has to provide the identifier "Maryland home improvement
commission license no “or "MHIC - ANSWER True


5. What is the maximum penalty the commission may impose upon a
contractor, licensed or unlicensed , per violation of these laws - ANSWER
$5,000


6. Advertising must be done in a way as to avoid misrepresentating the
product, service or Terms of sale so as not to deceive the customer. -
ANSWER True


7. An applicant must provide to the commission, a credit report with their
application. - ANSWER True

,8. How many days does a contractor have to respond to a receipt of a claim
from commission? - ANSWER 10 days


9. How many members are there in the Maryland home improvement
commission? - ANSWER 9 members


10.Of the 9 members on the commission , how many are experienced in home
improvement ? - ANSWER 4 member


11.Does home improvement include work done on an individual condominium
unit? - ANSWER Yes


12.Does home improvement include work done on a swimming pool? -
ANSWER Yes


13.Does a home improvement contract HAVE to be in writing in order to
preserve your lien rights? - ANSWER Yes


14.Contractors who can only contract with a contractor or a subcontractor are: -
ANSWER Subcontractors


15.A county or municipality in Maryland _____________ require a contractor
to get authorization from an official in that city to be able to contract in that
municipality. - ANSWER Cannot


16.If within ________ after the commission gives notice, a contractor on whose
amount a claim was paid does not reimburse the fund in full, the commission
may sue the contractor for reimbursement. - ANSWER 60 days

, 17.In addtion to full reimbursement of the fund, a contractor is responsible to
pay at least _________interest on the amount to reimburse. - ANSWER 10
%


18.The state can record a lien against any real property owners by the contractor
for a debt owed to the fund - ANSWER True


19.If the commission pays a claim from the fund base on the actions or
omissions of a contractor, the commission may suspend the contractors
license until full reimbursement of the fund plus at least 10%interest -
ANSWER True


20.A home improvement contract in compliance with the home improvement
laws would include all of the following except - ANSWER Names and
license numbers of subcontractors


21.A salesperson may not represent 2 contractors at the same time for the same
project. - ANSWER True


22.Can a sales person legally accept money for themselves from the customer -
ANSWER No


23.It is against the law for building and permits departments to issue a permit to
contractor without the contractors license number. - ANSWER True


24.If a contractor fails to correct violation of the building code within
reasonable time period, the county or municipality inspecting the project
shall notify the commission - ANSWER True

Geschreven voor

Instelling
MHIC NASCLA CONTRACTORS
Vak
MHIC NASCLA CONTRACTORS

Documentinformatie

Geüpload op
27 april 2026
Aantal pagina's
27
Geschreven in
2025/2026
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

$10.99
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Maak kennis met de verkoper
Seller avatar
DrSammuel

Maak kennis met de verkoper

Seller avatar
DrSammuel TeachmeTutor
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
4
Lid sinds
4 maanden
Aantal volgers
0
Documenten
620
Laatst verkocht
1 week geleden
Turning Preparation into Achievement.

Welcome to my study resource hub! This account provides high-quality exam papers with clear and detailed elaborations designed to help students fully understand each topic and pass with confidence.

0.0

0 beoordelingen

5
0
4
0
3
0
2
0
1
0

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen