minimum anchor spacing and edge distance, as well as minimum member thickness,
must comply with the values given -CORRECTANSWER In the products ICC-ES
Report
The registered design professional in responsible charge and the engineers of record
involved in the design of the project are permitted to act as the -CORRECTANSWER
Approved Agency
If reinforcing bars are encountered during drilling the correct action would be -
CORRECTANSWER Consulting with the EOR
for adhesive anchors, the characteristics bond stresses and suitability for structural
applications are established by testing in accordance with -CORRECTANSWER ACI
355.4
,Special inspections and tests shall be required for proposal work that is, in the opinion
of the building official, unusual in its nature, as such, but not limited to -
CORRECTANSWER All of the above
ACI 355.4, qualification of post installed adhesive anchors in concrete, is applicable to
anchors with a specified minimum embedment depth of -CORRECTANSWER 1 - 5/8
inches
Proof loads are usually determined as a -CORRECTANSWER Percentage of the
anchor ultimate tensile strength
True or False: The contractor is permitted to employ the approved agencies for special
inspection where the contractor is also the owner of the project? -CORRECTANSWER
True
The effective embedment depth, measure from the concrete surface to the deepest
point at which bond to the concrete is established is identified as -CORRECTANSWER
h subscript(ef)
True or false: Powers PE1000+ epoxy adhesive are recognized for use to resist short-
term and long-term loads, including wind and earthquake loads, subject to conditions of
the ICC-ES Evaluation report? -CORRECTANSWER True
, Short sections of anchor rods the have been burned or sawed are indictive of: -
CORRECTANSWER Incorrect embedment
The elapsed time after mixing adhesive material components to onset of significant
chemical reaction as characterized by an increase in viscosity is -CORRECTANSWER
Gel Time
Periodic and final inspection reports are required to be summited to the -
CORRECTANSWER Building official and engineer or architect of record
Powers PE1000+ epoxy adhesive anchors must be installed in accordance with? -
CORRECTANSWER The manufacturers published installation instructions
ACI 355.4-11 qualification of post installed adhesive anchors in concrete standard
applies to anchors with diameter of 1/4in or larger and an embedment depth not
exceeding: -CORRECTANSWER 20d(a)
The( ) ensures that the components are well mixed so the adhesive resin is activated by
the hardener -CORRECTANSWER Mixing Nozzle
The ICC-ES evaluation report for the powers 1000+ product specifies that holes drilled
in concrete be cleaned out by using? -CORRECTANSWER Steel wire brush
2026) COMPREHENSIVE QUESTIONS
AND VERIFIED DETAILED SOLUTIONS
|COMPLETE SOLUTIONS |A+ GRADED
|100% CORRECT!!
minimum anchor spacing and edge distance, as well as minimum member thickness,
must comply with the values given -CORRECTANSWER In the products ICC-ES
Report
The registered design professional in responsible charge and the engineers of record
involved in the design of the project are permitted to act as the -CORRECTANSWER
Approved Agency
If reinforcing bars are encountered during drilling the correct action would be -
CORRECTANSWER Consulting with the EOR
for adhesive anchors, the characteristics bond stresses and suitability for structural
applications are established by testing in accordance with -CORRECTANSWER ACI
355.4
,Special inspections and tests shall be required for proposal work that is, in the opinion
of the building official, unusual in its nature, as such, but not limited to -
CORRECTANSWER All of the above
ACI 355.4, qualification of post installed adhesive anchors in concrete, is applicable to
anchors with a specified minimum embedment depth of -CORRECTANSWER 1 - 5/8
inches
Proof loads are usually determined as a -CORRECTANSWER Percentage of the
anchor ultimate tensile strength
True or False: The contractor is permitted to employ the approved agencies for special
inspection where the contractor is also the owner of the project? -CORRECTANSWER
True
The effective embedment depth, measure from the concrete surface to the deepest
point at which bond to the concrete is established is identified as -CORRECTANSWER
h subscript(ef)
True or false: Powers PE1000+ epoxy adhesive are recognized for use to resist short-
term and long-term loads, including wind and earthquake loads, subject to conditions of
the ICC-ES Evaluation report? -CORRECTANSWER True
, Short sections of anchor rods the have been burned or sawed are indictive of: -
CORRECTANSWER Incorrect embedment
The elapsed time after mixing adhesive material components to onset of significant
chemical reaction as characterized by an increase in viscosity is -CORRECTANSWER
Gel Time
Periodic and final inspection reports are required to be summited to the -
CORRECTANSWER Building official and engineer or architect of record
Powers PE1000+ epoxy adhesive anchors must be installed in accordance with? -
CORRECTANSWER The manufacturers published installation instructions
ACI 355.4-11 qualification of post installed adhesive anchors in concrete standard
applies to anchors with diameter of 1/4in or larger and an embedment depth not
exceeding: -CORRECTANSWER 20d(a)
The( ) ensures that the components are well mixed so the adhesive resin is activated by
the hardener -CORRECTANSWER Mixing Nozzle
The ICC-ES evaluation report for the powers 1000+ product specifies that holes drilled
in concrete be cleaned out by using? -CORRECTANSWER Steel wire brush