Explain the purpose of the AIRSpeed program. - Answer To enhance the effectiveness of
naval aviation by implementing Continuous Process Improvement (CPI) methods to improve
quality and productivity.
What are three CPI methods? - Answer -Lean
-Six Sigma
-Theory of Constraints(ToC)
Describe the Lean method - Answer To expose waste to balance operational and standard
workflows by incremental improvements at a time. The goal is to achieve perfection through
the total elimination of waste in the value stream.
Describe the Six Sigma method - Answer Focuses on reducing variation from the customer
requirement by reducing process defects,errors, and rework. Improves reliability of the process.
Describe the Theory of Constraints method. - Answer Identifying the most limiting factor
(constraint/bottleneck) and improving it until it is no longer a limiting factor.
Define the 5s checklist - Answer -Sort
-Stabilize
-Shine
-standardize
-sustain
Who is responsible for the 5s checklist - Answer Work Center Supervisors
Describe NAT and the Purpose of NAT reports. - Answer NIIN Analysis Tool. Provides
maintenance managers with a view of all NIINs (national item identification number) processed
at Intermediate Maintenance Activities (IMAs)
Demonstrate Use of the NAT to look for improvement opportunities - Answer To see if an
item can be used instead of another item if it benefits the work process
,Describe BMT and state the purpose of BMT reports - Answer Buffer Management Tool
provides the ability to see constraints in production and where to focus CPI activities to improve
production (TRR).
Describe CPIMS and its purpose. - Answer Continuous Process Improvement Management
System lets managers track and demonstrate the benefits of CPI efforts within their organization
and other commands.
Who is responsible for ensuring all AIRSpeed/CPI projects and supporting documentation is
recorded in CPIMS? - Answer the AIRSpeed officer has 15 days of tollgate review or event
completion to input the documentation into CPIMS
Describe VSA and its purpose - Answer Value Steam Analysis gives an overview of multiple
processes and is used to show areas needing improvement for future CPI events.
Describe RIE and its purpose - Answer Rapid Improvement event is when you implement
change using the CPI process and move the DoN towards strategic CPI objectives.
Describe JDI and why its performed - Answer Just-Do-IT is a fast CPI event that improves the
current state quickly.
Describe DMAIC and its purpose - Answer Define,Measure,Analyze,Implement, and Control.
Used when the root of the constraint is unknown and a wider range of LSS tools are needed to
analyze and design solutions
What is the purpose of production control? - Answer Material Management Concept Sets
goals and priorities, improves response time and records, and assigns supply priorities and
project codes.
EXREP - Answer Expeditious Repair. Accomplished when the item is immediately removed
from the aircraft and is repaired with the earliest return to RFI status for supply issue under the
standard material issue priority system.
OW - Answer owed. Asset is owed to the system or to another activity
SO - Answer Supply Officer. Asset stock on supply shelf noncritical item
Describe the use of JCN in I-level - Answer The JCN is used to identify a subassembly or sub-
subassembly repair action performed independently of the major component repair. Used by
IMA only.
, What is a cognizance (COG) code - Answer Cognizance symbol is a two position numeric
alpha code in NSNs that identifies the type of funds used to purchase the item and what activity
is the inventory manager.
What is the importance of a WUC - Answer identifies the ranking structure of
assemblies,systems, etc of a weapons system. Utilized for documentation of maintenance tasks.
Up to 32 characters in length.
What is a SM&R code? - Answer Source, Maintenance, and Recoverability Code assigned to
items to convey specific info to maintenance and supply personnel. Has 3 parts
SM&R code positions - Answer First position: Means of acquiring support
Second position: Means of acquiring support
Third position: Lowest level authorized to R/R item
Fourth position: lowest level with capability to perform complete repair action
Fifth position: Disposition
Sixth position: Assigned to support items to convey specific info to the service's logistics forces
Explain the Purpose the the individual component repair list (ICRL) - Answer Is the primary
reference for items processed through AMSU or JASU.
ICRL Capability Codes - Answer A1- T/C only
C1-Capable of Repair
C3- Limited Repair
D1- Full D-lvl
D3- Limited D-lvl
M1- Assemble/Manufacture
R1- Repair and return to original IMA
X1- Repair not authorized
X2- Lack of tools/equipment/facilities
X3- Lack of required skills
X6- lack of technical data
BCM codes - Answer BCM 1- Repair not authorized
BCM 2- Lack of equipment,tools, or facilities
BCM 3- Lack of technical skills