TEST PAPER WITH CORRECT ANSWERS
GRADED A+
⩥ Basic Forms of CM. Answer: Agency and at-risk. Key differences
⩥ Agency CM Is a Distinct Set of Services That Can Be Applied to Any
Project Delivery Method.. Answer: True
⩥ CMAA Has Maintained a Position of Being Project Delivery Method
Neutral. What Does This Mean?. Answer: They do not advocate a
particular project delivery method.
⩥ When Referring to the Traditional Project Delivery Method, This
Means What Project Delivery Method Is Going to Be Used?. Answer:
Design-bid-build
⩥ Once a construction contract is signed, what is the major advantage to
the owner of the design-bid-build project delivery method?. Answer:
Transfer of risk
⩥ When using the design-bid-build project delivery method, what is the
most important element of the process?. Answer: Complete project
documents
,⩥ During construction, the CM-at-Risk project delivery method has the
CM in a position equivalent to:. Answer: A general contractor
⩥ What is the primary benefit to the owner of the design-build project
delivery method?. Answer: One party responsible for design &
construction
⩥ A project delivery approach that is gaining acceptance for allocating
risks among project teams is referred to as the ________ method..
Answer: IPD
⩥ A CM must be aware of its contractual obligations regarding safety on
the project site.. Answer: True
⩥ Contract documents are important in determining the safety
responsibilities of the CM.. Answer: False
⩥ What are the two basic types of multiple-prime contracting methods?.
Answer: Trade contracting & phased construction
⩥ The OSHA provisions are applicable to all commercial projects..
Answer: True
, ⩥ Risk may be allocated by:. Answer: Contract
⩥ First step in risk allocation process:. Answer: Identify the sources of
risk and assess their impact on the project
⩥ Owner's best interest in risk allocation:. Answer: True
⩥ FALSE statement about risk allocation:. Answer: Assumption of the
risk by other parties results in lower cost to the owner.
⩥ Indemnification definition:. Answer: True
⩥ Limitation provision and liability to client:. Answer: True
⩥ CM's insurance coverage for employee claims:. Answer: True
⩥ Process of evaluating construction documents:. Answer:
Constructibility review
⩥ Document prepared after contractor declares substantial completion:.
Answer: Punchlist