NAVY 3M COMPREHENSIVE TEST 2026
QUESTIONS WITH SOLUTIONS GRADED A+
●● The objectives of 3m Answer: Standardization, efficiency,
documentation, analysis, configuration status accounting, scheduling
●● SCLSIS Answer: Ship Configuration and Logistic Support
information System
●● What does SCLSIS affect? Answer: Navy's ability to efficiently plan
and perform maintenance, accomplish alterations, and provide necessary
logistics support for the ships
●● PMS Answer: Planned Maintenance System
●● What is PMS Answer: A standardized method of planning,
scheduling, and accomplishing, preventive maintenance
●● IEM Answer: Inactive Equipment Maintenance
●● What does IEM provide? Answer: Modified PMS procedures for
maintenance of systems and equipment during extended periods of
inactivation or non-operation, such as, during overhauls, availabilities,
and other periods when equipment is not operated
, ●● MDS Answer: Maintenance Data System
●● What is MDS? Answer: The means in which maintenance personnel
can report applicable maintenance requirements and configuration
changes on all categories of equipment
●● CSMP Answer: Current Ships Maintenance Project
●● What is CSMP Answer: Maintenance requests, managing planning
and scheduling, reporting actions and material condition of equipment
●● Commanding officer Answer: Overall responsibility for ensuring
ship maintenance
●● Executive officer Answer: Ships 3m system manager, responsible for
spot check program
●● 3m system coordinator Answer: The functional manager
●● Department head Answer: Responsible for the effective operation of
the 3m system within the department. They will supervise maintenance
scheduling and ensure personal are trained
QUESTIONS WITH SOLUTIONS GRADED A+
●● The objectives of 3m Answer: Standardization, efficiency,
documentation, analysis, configuration status accounting, scheduling
●● SCLSIS Answer: Ship Configuration and Logistic Support
information System
●● What does SCLSIS affect? Answer: Navy's ability to efficiently plan
and perform maintenance, accomplish alterations, and provide necessary
logistics support for the ships
●● PMS Answer: Planned Maintenance System
●● What is PMS Answer: A standardized method of planning,
scheduling, and accomplishing, preventive maintenance
●● IEM Answer: Inactive Equipment Maintenance
●● What does IEM provide? Answer: Modified PMS procedures for
maintenance of systems and equipment during extended periods of
inactivation or non-operation, such as, during overhauls, availabilities,
and other periods when equipment is not operated
, ●● MDS Answer: Maintenance Data System
●● What is MDS? Answer: The means in which maintenance personnel
can report applicable maintenance requirements and configuration
changes on all categories of equipment
●● CSMP Answer: Current Ships Maintenance Project
●● What is CSMP Answer: Maintenance requests, managing planning
and scheduling, reporting actions and material condition of equipment
●● Commanding officer Answer: Overall responsibility for ensuring
ship maintenance
●● Executive officer Answer: Ships 3m system manager, responsible for
spot check program
●● 3m system coordinator Answer: The functional manager
●● Department head Answer: Responsible for the effective operation of
the 3m system within the department. They will supervise maintenance
scheduling and ensure personal are trained