●● What does the acronym MRC stand for? Answer: Maintenance
Requirement Card
●● What is a LOEP? Answer: The LOEP provides a listing of the
Maintenance Index Pages (MIP) and also system equipment not
requiring PMS assigned to each work center.
●● What does HMUG stand for? Answer: Hazardous Material Users
Guide
●● What information is in the HMUG? Answer: Compatibility info,
control measures, precautions health hazards, spill control and disposal
guide.
●● On a MIP page under related maintenance, what does the (##) sign
mean? Answer: 'There is mandatory related maintenance associated with
the MRC. Maintenance requirements that must be accomplished
concurrently with another maintenance requirement.
●● When is the new IR installed? Answer: Every quarter/ 4 times a year.
, ●● What does the periodicity code '2-W' stand for? Answer: Accomplish
every second week.
●● What does CSMP stand for? Answer: Current ship maintenance
project.
●● What does JSN stand for? Answer: Job sequence number.
●● What does periodicity code '18M 5R' stand for? Answer: Accomplish
every 18 months or as required.
●● What is a FBR (Feed Back Report) used for? Answer: It is used to
notify Fleet Technical Support (FTSC) of matters related to PMS, such
as technical discrepancies, shift of maintenance responsibility, and
Tycom assistance.
●● What type of feedback report deals with safety issues? Answer:
Urgent, when the reason for submission of a PMS FBR involves safety
of personnel, ship or potential for damage to equipment and relates to
the technical requirements of PMS. Has to be off the ship/command in
24 hours.
●● What must be done if changes to an MRC are required or questions
about the information on a MRC? Answer: Notify center sup; they will
submit a feedback report.
QUESTIONS WITH SOLUTIONS GRADED A+
●● What does the acronym MRC stand for? Answer: Maintenance
Requirement Card
●● What is a LOEP? Answer: The LOEP provides a listing of the
Maintenance Index Pages (MIP) and also system equipment not
requiring PMS assigned to each work center.
●● What does HMUG stand for? Answer: Hazardous Material Users
Guide
●● What information is in the HMUG? Answer: Compatibility info,
control measures, precautions health hazards, spill control and disposal
guide.
●● On a MIP page under related maintenance, what does the (##) sign
mean? Answer: 'There is mandatory related maintenance associated with
the MRC. Maintenance requirements that must be accomplished
concurrently with another maintenance requirement.
●● When is the new IR installed? Answer: Every quarter/ 4 times a year.
, ●● What does the periodicity code '2-W' stand for? Answer: Accomplish
every second week.
●● What does CSMP stand for? Answer: Current ship maintenance
project.
●● What does JSN stand for? Answer: Job sequence number.
●● What does periodicity code '18M 5R' stand for? Answer: Accomplish
every 18 months or as required.
●● What is a FBR (Feed Back Report) used for? Answer: It is used to
notify Fleet Technical Support (FTSC) of matters related to PMS, such
as technical discrepancies, shift of maintenance responsibility, and
Tycom assistance.
●● What type of feedback report deals with safety issues? Answer:
Urgent, when the reason for submission of a PMS FBR involves safety
of personnel, ship or potential for damage to equipment and relates to
the technical requirements of PMS. Has to be off the ship/command in
24 hours.
●● What must be done if changes to an MRC are required or questions
about the information on a MRC? Answer: Notify center sup; they will
submit a feedback report.