●● Construction Quality Management is the performance of tasks,
which ensure that construction is performed.
Answer: According to plans and specifications, on time, within a defined
budget and a safe work environment.
●● Partnering relationships are based upon:
Answer: Building trust and dedication to common goals
●● It is the responsibility of Quality Assurance Personnel to:
Answer: Periodically verify that the contractors system of control is
working effectively.
●● An effective contractor quality control program will:
Answer: Be an incentive for work to be done correctly the first time
resulting in earlier completion, reduced field overhead costs, and greater
profits.
●● The success or failure of all contractors is based upon:
Answer: The ability to control costs, finance work, estimate jobs,
schedule the work, and maintain effective quality control.
, ●● Quality Assurance Personnel have the responsibility to:
Answer: Require contractors to maintain the quality specified in the
plans and specifications.
●● Inspection is:
Answer: The process by which ongoing and completed work is
examined
●● During the punch-out inspection of a project:
Answer: Quality Assurance Personnel must assure that the contractor
prepares a punch-list and makes corrections.
●● If there is a disagreement whether the contractors work complies
with the contract:
Answer: The government makes the final determination
●● Characteristics that describe a definable feature of work include:
Answer: Cross-referenced listings to the contractors construction
schedule that may have more than one definable feature under a section
of the specifications.
●● The _____________________ consists of daily checks of the work
to assure continuing compliance with contract requirements.