ACTUAL CORRECT ANSWERS RATED
100% COMPLETE
Covers the requirements for the ICT systems team and lists the elements of the
installation. - Correct Answer ✔✔ Scope of Work (SOW)
A form of communication between the contractor and owner defining the specifics of
how a job will be undertaken. - Correct Answer ✔✔ Submittals
A written document that states the legal obligations of the customer and the contractor. -
Correct Answer ✔✔ Contract
Contains all of the installation items by description, catalog number, quantity, unit price,
and total price. - Correct Answer ✔✔ Material List
A place to record detailed notes on any issues that arise. - Correct Answer ✔✔ Project
Log
Drawings, specs, material list, Scope of Work. - Correct Answer ✔✔ Contract
Documents
List of milestones, activities, and deliverables. - Correct Answer ✔✔ Project Schedule
Project logs, acceptance plan, RFI, change orders, and closeout documents. - Correct
Answer ✔✔ Project Documents
verify installation information. - Correct Answer ✔✔ Site Survey
Review and incorporate the correct safety plan. - Correct Answer ✔✔ Safety Plan
Reflected ceiling plan. - Correct Answer ✔✔ RCP (drawing)
Architectural drawings. A plan (top view) of each floor in a building. - Correct Answer
✔✔ A drawing
Mechanical drawings. HVAC routing, air handler units, and water piping. - Correct
Answer ✔✔ M drawing
Electrical Drawing. - Correct Answer ✔✔ E drawing
Plumbing drawing. - Correct Answer ✔✔ P drawing
, Fire protection drawing. - Correct Answer ✔✔ FP drawing
Telecommunication drawing - Correct Answer ✔✔ T drawing
Structural drawing. - Correct Answer ✔✔ S drawing
cover page/campus plan - Correct Answer ✔✔ T0 drawing
Floor plan, layout, and locations. - Correct Answer ✔✔ T1 drawing
serving zones. - Correct Answer ✔✔ T2 drawing
Equipment room drawings. - Correct Answer ✔✔ T3 drawing
Detail drawings. - Correct Answer ✔✔ T4 drawing
cable schedule/IDS (homerun tracking sheet) - Correct Answer ✔✔ T5
Formal listing of items or issues needing resolution before the project is designated as
complete. Needs to clearly define the specific steps or work tasks that need to be
completed. - Correct Answer ✔✔ Punch List
M drawing (mechanical). - Correct Answer ✔✔ Which drawing indicates the size and
route of the HVAC system ducts, air handler units, chilled water piping, and refrigerant
piing within the structures?
T0 drawing - Correct Answer ✔✔ Which drawing shows the campus or site plans
exterior pathways and interbuilding systems?
Scope of Work (SoW) - Correct Answer ✔✔ What important document covers the
requirements, lists all of the elements of the installation, and is usually generated by the
customer or the designer?
RFI form (request for information). - Correct Answer ✔✔ Which document is used to
request clarification, supplemental information, or approval of materials substitution?
Punch list. - Correct Answer ✔✔ What document is a formal listing of items or issues
needing resolution before the project is designated as complete?
Work site, company-controlled location, distributor - Correct Answer ✔✔ Material
storage sites (3)
Pre-Installation meeting. - Correct Answer ✔✔ Which meeting occurs after the initial
construction meeting that discusses all aspects related to the project with the PM,
installation team, and appropriate contractors?