RHODE ISLAND CERTIFICATION EXAM
QUESTIONS WITH RIGHT ANSWERS .
Red marker - Correct Answer -Electric line
Yellow marker - Correct Answer -Gas line
Orange marker - Correct Answer -Communication line
Blue marker - Correct Answer -Potable water line
Green marker - Correct Answer -Sewer line
Purple marker - Correct Answer -Reclaimed water line
Pink marker - Correct Answer -Temp survey
White marker - Correct Answer -Proposed excavation
Accepted Engineering Practice - Correct Answer -means those requirements which are
compatible with standards of practice required by a registered professional engineer.
Aluminum Hydraulic Shoring - Correct Answer -means a pre-engineered shoring system
comprised of aluminum hydraulic cylinders (crossbraces) used in conjunction with vertical
rails (uprights) or horizontal rails (walers). Such system is designed, specifically to support
the sidewalls of an excavation and prevent cave-ins
Bell-bottom pier hole - Correct Answer -a type of shaft or footing excavation, the bottom of
which is made larger than the cross section above to form a belled shape.