RWP PG EXAM QUESTIONS WITH
COMPLETE SOLUTIONS
type of working limits on controlled track - CORRECT ANSWER✔✔-foul time,
| | | | | | | | | | |
exclusive track occupancy
| |
type of working limits on non-controlled track - CORRECT ANSWER✔✔-
| | | | | | | | |
inaccessible track |
type of train approach warning - CORRECT ANSWER✔✔-watchman
| | | | | | |
type of train approach warning - CORRECT ANSWER✔✔-individual train detection
| | | | | | | | |
What type of work roadway workers do? - CORRECT ANSWER✔✔-inspection and
| | | | | | | | | | |
construction of track, maintenance of bridges, repair of signal and
| | | | | | | | | |
communication systems, repair of RMM | | | |
True or false. Fouling a track can apply to both people and machinery - CORRECT
| | | | | | | | | | | | | | |
ANSWER✔✔-True
Within what distance to the track is a roadway worker considered fouling it? -
| | | | | | | | | | | | | |
CORRECT ANSWER✔✔-4 feet from the nearest running rail
| | | | | | |
, a what authorizes movements on controlled track. - CORRECT ANSWER✔✔-
| | | | | | | | |
Operator/Dispatcher
The RWIC is required to be qualified on physical characteristics when their group
| | | | | | | | | | | | |
is working on.... - CORRECT ANSWER✔✔-All tracks
| | | | | |
The EIC is an employee who is in charge of.... - CORRECT ANSWER✔✔-A work
| | | | | | | | | | | | | |
group
The main role of the RWIC is.... - CORRECT ANSWER✔✔-To establish on track
| | | | | | | | | | | | |
safety
When can personal electronic devices be used while on duty? - CORRECT
| | | | | | | | | | | |
ANSWER✔✔-If there is an emergency at the job site and no other forms of
| | | | | | | | | | | | | |
communication are available | |
Prior to performing any task that requires fouling a track or has the potential to
| | | | | | | | | | | | | | |
foul a track, all roadway workers must participate in an.... - CORRECT
| | | | | | | | | | | |
ANSWER✔✔-on-track safety briefing | |
The safety briefing must be conducted.... - CORRECT ANSWER✔✔-At the job
| | | | | | | | | | |
location
Whistle boards are required when.... - CORRECT ANSWER✔✔-5 or more
| | | | | | | | | |
employees are working for more than 1 hour
| | | | | | |
COMPLETE SOLUTIONS
type of working limits on controlled track - CORRECT ANSWER✔✔-foul time,
| | | | | | | | | | |
exclusive track occupancy
| |
type of working limits on non-controlled track - CORRECT ANSWER✔✔-
| | | | | | | | |
inaccessible track |
type of train approach warning - CORRECT ANSWER✔✔-watchman
| | | | | | |
type of train approach warning - CORRECT ANSWER✔✔-individual train detection
| | | | | | | | |
What type of work roadway workers do? - CORRECT ANSWER✔✔-inspection and
| | | | | | | | | | |
construction of track, maintenance of bridges, repair of signal and
| | | | | | | | | |
communication systems, repair of RMM | | | |
True or false. Fouling a track can apply to both people and machinery - CORRECT
| | | | | | | | | | | | | | |
ANSWER✔✔-True
Within what distance to the track is a roadway worker considered fouling it? -
| | | | | | | | | | | | | |
CORRECT ANSWER✔✔-4 feet from the nearest running rail
| | | | | | |
, a what authorizes movements on controlled track. - CORRECT ANSWER✔✔-
| | | | | | | | |
Operator/Dispatcher
The RWIC is required to be qualified on physical characteristics when their group
| | | | | | | | | | | | |
is working on.... - CORRECT ANSWER✔✔-All tracks
| | | | | |
The EIC is an employee who is in charge of.... - CORRECT ANSWER✔✔-A work
| | | | | | | | | | | | | |
group
The main role of the RWIC is.... - CORRECT ANSWER✔✔-To establish on track
| | | | | | | | | | | | |
safety
When can personal electronic devices be used while on duty? - CORRECT
| | | | | | | | | | | |
ANSWER✔✔-If there is an emergency at the job site and no other forms of
| | | | | | | | | | | | | |
communication are available | |
Prior to performing any task that requires fouling a track or has the potential to
| | | | | | | | | | | | | | |
foul a track, all roadway workers must participate in an.... - CORRECT
| | | | | | | | | | | |
ANSWER✔✔-on-track safety briefing | |
The safety briefing must be conducted.... - CORRECT ANSWER✔✔-At the job
| | | | | | | | | | |
location
Whistle boards are required when.... - CORRECT ANSWER✔✔-5 or more
| | | | | | | | | |
employees are working for more than 1 hour
| | | | | | |