Terms in this set (78)
Hard bid low price Owner hires architect
Architect designs
Contractors bid
Awarded to low bidder
, Competitive sealed proposals Involves criteria other than price when awarding
contract
Weight given to each criteria that will be considered
Criteria: (changes)
- Cost
- Previous experience
- Qualification of staff
- Financial stability
- Project schedule
Construction Manager at Risk CMAR Construction manager hired in design phase to assist
designer in constructability.
CM agrees to Guaranteed max price
CM works w owner and architect
Design Build Only one contract - between owner and design-
build contractor
May be one entity or contractor and architect in a
contract.
Wasn't allowed for a while
most common steel type? a) A529 - 50 KSI
a) A529 - 50 KSI
b) A36 - 36 KSI
Weathering steel c) Both
a)A242
b)A585
c) both
Flag weld symbol meaning Field weld (on site)
4 types of envelope construction Tilt Wall
Stud with veneer
Masonry
Glass
Air/Vapor Barrier is always installed on Inside
___ of wall.