SWPPP QUESTIONS AND VERIFIED ANSWERS
Clean Water Act - Answers - Law set into place in 1970 for storm water regulation
NPDES - Answers - Regulations for monitoring storm water activity on a construction
site, are outlined in
Immediately after project is awarded and before you begin any site work - Answers -
When should you read and understand SWPP
Contaminated ground water - Answers - What is not an allowable storm water discharge
or non-storm water discharge
When jurisdiction of operations specifies you can start - Answers - When may
construction activity begin
303D list - Answers - Waters that fail anti-degradation list are placed on which list.
An officer and project owner - Answers - SWPPPs certification are signed by who
FALSE - Answers - The document that must be completed signed and submitted to the
state to obtain authorization to discharge is the NOT. (T/F)
All construction has been completed both inside and outside - Answers - NOT can be
filed when
is in charge of daily activities - Answers - Operations on a construction site are the entity
in charge of plans and specification and the entity who?
Stay out of trouble with the law - Answers - Motives for staying in compliance with storm
water objectives?
To protect and preserve beneficial use of U.S. waters, maintaining their clean, physical
and biological integrity - Answers - Objectives of the clean water act are
National Pollutant Discharge Elimination System - Answers - NPDES stands for
Site description and maps, inspection and maintenance procedure. Potential pollutant
sources, schedules of activities, site contact information, plan certification documents,
site contact info and descriptions of controls BMP - Answers - Which are a component
of a good SWPPP
False - Answers - Construction sediment is not considered a potential pollutant source
(T/F)
, Project owner, SWPPP designer - Answers - When modifying or substituting a storm
water BMP the contractor must consult with
False - Answers - NOI must be submitted to the appropriate agency before the storm
water pollution preventive plan is developed (T/F)
False, 303d List - Answers - Name of the list with impaired waters is called totally daily
maximum load (T/F)
It is required by law, it documents storm water management activity on your site, and it
demonstrates your intent to manage storm water on your site - Answers - You should
have a SWPPP for your construction site because?
Site specific - Answers - A well constructed SWPPP for your site should be?
Prior to commencing construction - Answers - The NOI must be submitted when?
Schedule of activities - Answers - One necessary component of a good SWPPP is?
Weather and Climate - Answers - Factors that may impact SWPPP scheduling activities
include
masonry materials, petroleum storage tanks, soil amendments fertilizer, lime etc -
Answers - Pollutant sources on a construction may include
Seek written approval of the project SWPPP designer or project owner - Answers - If
you believe BMP modification are necessary to the site you must?
Endangered species and historical preservation - Answers - The following consideration
may be incorporated into the SWPPP?
Site maps, erosion sediment control, BMPs, site specific sequences of construction
activities - Answers - The SWPPP will contain the following?
Identify deficient and failed BMPs and make repairs immediately - Answers - Once the
site has experienced rain event of measurable quantity you must?
Subcontractors web site - Answers - The subcontractor certification includes all of the
following but the following?
Storm Water BMPs and their locations - Answers - SWPPP site map includes the
following
Present and current - Answers - With the state general permit your primary
responsibility is to make sure the permit is?
Clean Water Act - Answers - Law set into place in 1970 for storm water regulation
NPDES - Answers - Regulations for monitoring storm water activity on a construction
site, are outlined in
Immediately after project is awarded and before you begin any site work - Answers -
When should you read and understand SWPP
Contaminated ground water - Answers - What is not an allowable storm water discharge
or non-storm water discharge
When jurisdiction of operations specifies you can start - Answers - When may
construction activity begin
303D list - Answers - Waters that fail anti-degradation list are placed on which list.
An officer and project owner - Answers - SWPPPs certification are signed by who
FALSE - Answers - The document that must be completed signed and submitted to the
state to obtain authorization to discharge is the NOT. (T/F)
All construction has been completed both inside and outside - Answers - NOT can be
filed when
is in charge of daily activities - Answers - Operations on a construction site are the entity
in charge of plans and specification and the entity who?
Stay out of trouble with the law - Answers - Motives for staying in compliance with storm
water objectives?
To protect and preserve beneficial use of U.S. waters, maintaining their clean, physical
and biological integrity - Answers - Objectives of the clean water act are
National Pollutant Discharge Elimination System - Answers - NPDES stands for
Site description and maps, inspection and maintenance procedure. Potential pollutant
sources, schedules of activities, site contact information, plan certification documents,
site contact info and descriptions of controls BMP - Answers - Which are a component
of a good SWPPP
False - Answers - Construction sediment is not considered a potential pollutant source
(T/F)
, Project owner, SWPPP designer - Answers - When modifying or substituting a storm
water BMP the contractor must consult with
False - Answers - NOI must be submitted to the appropriate agency before the storm
water pollution preventive plan is developed (T/F)
False, 303d List - Answers - Name of the list with impaired waters is called totally daily
maximum load (T/F)
It is required by law, it documents storm water management activity on your site, and it
demonstrates your intent to manage storm water on your site - Answers - You should
have a SWPPP for your construction site because?
Site specific - Answers - A well constructed SWPPP for your site should be?
Prior to commencing construction - Answers - The NOI must be submitted when?
Schedule of activities - Answers - One necessary component of a good SWPPP is?
Weather and Climate - Answers - Factors that may impact SWPPP scheduling activities
include
masonry materials, petroleum storage tanks, soil amendments fertilizer, lime etc -
Answers - Pollutant sources on a construction may include
Seek written approval of the project SWPPP designer or project owner - Answers - If
you believe BMP modification are necessary to the site you must?
Endangered species and historical preservation - Answers - The following consideration
may be incorporated into the SWPPP?
Site maps, erosion sediment control, BMPs, site specific sequences of construction
activities - Answers - The SWPPP will contain the following?
Identify deficient and failed BMPs and make repairs immediately - Answers - Once the
site has experienced rain event of measurable quantity you must?
Subcontractors web site - Answers - The subcontractor certification includes all of the
following but the following?
Storm Water BMPs and their locations - Answers - SWPPP site map includes the
following
Present and current - Answers - With the state general permit your primary
responsibility is to make sure the permit is?