SWPP WALMART TEST QUESTIONS AND VERIFIED
ANSWERS


True or False? A labor laws placard must be posted. - Answers - True

True or False? The GC shall ensure that all subcontractors and their workers have
secured, maintained, and complied with all required licenses, permits and certificates
relating to, or otherwise necessary or appropriate for, the performance and completion
of the work and all other activities and obligations under the Contract Documents. -
Answers - True

Which of the following is required to be present at the job site?
A. Safety Manual and up to date MSDS binder
B. SWPP certificate posted
C. Visitors sign in book
D. All of the Above - Answers - All of the above

The SWPP implementation sequence may be modified? - Answers - After consulting
with the project SWPP Designer (CEC) and, if required, the Project Owner and
receiving written approval.

True or False: the GC doesn't need to worry about access control after possession. -
Answers - False

When installing perimeter BMP controls: - Answers - Note locations and dates of
installation on the site map.

A SWPP Site Map will show all of the following except:
A. Locations of BMPs
B. Notices of Violation
C. Phasing and Sequence
D. Limits of Disturbance - Answers - B. Notices of Violation C

In what circumstances must your company run newly hired employees through E-
Verify? - Answers - Any new hire employees who will provide services to Walmart in a
mandatory E-Verify State: AL, AZ, GA, LA, MS, NC, SC, TN or UT.

Factors to consider when creating your schedule include: - Answers - Account for the
time it takes to install or implement BMP's between each phase of construction

Which of the following is not a silt fence related deficiency?
A. Tears or holes in the fabric
B. Excessive sediment accumulation

, C. Track out
D. Undercutting - Answers - C. Trackout

Requirements for managing stormwater activity on a construction site are outlined in the
following regulation: - Answers - NPDES

True or False: Subcontractors do not need a GC badge during the first week of
construction as this is the slowest time of the project. - Answers - False

Runoff Controls include all but which of the following:
A. Rolled erosion control products
B. Diversions
C. Check dams
D. Slope drains - Answers - A. Rolled erosion control products

To reduce the possibility of undercutting in channels, you should: - Answers - Install
filter fabric under rock and similar materials placed within the stormwater conveyance

In addition to Worker Verification and badging, what other incidents and/or regulatory
contacts may happen? - Answers - Immigration, E-Verify, wages, harassment,
discrimination and joint employment.

If a worker is removed during an audit, are they allowed back on site? - Answers - Yes,
if the auditor clears them.

When inspecting inlet protection look for all but one of the following:
A. Structural damage including torn fabric and broken supports
B. Restricted flow and bypass
C. Appropriate vegetative stabilization
D. Accumulated sediment and debris - Answers - C. Appropriate vegetative stabilization
D

If you believe stormwater BMP modifications are necessary, you must: - Answers -
Seek written approval from the project SWPP designer and, if required, the project
Owner.

Which of the following is NOT a beneficial use of water?
A. Swimming
B. Drinking
C. Flushing a spill down a storm drain
D. Industrial and agricultural water supply - Answers - C. Flushing a spill down a storm
drain D

While inspecting filed BMPs, the SWPP inspector should perform all of the following
except:
A. Note BMPs in need of repair or maintenance

Geschreven voor

Instelling
SWPPP
Vak
SWPPP

Documentinformatie

Geüpload op
3 mei 2026
Aantal pagina's
6
Geschreven in
2025/2026
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

$13.49
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
GEEKA YALA UNIVERSITY
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
2107
Lid sinds
4 jaar
Aantal volgers
1446
Documenten
54070
Laatst verkocht
17 uur geleden

3.8

358 beoordelingen

5
177
4
61
3
48
2
17
1
55

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen