STORMWATER EXAM QUESTIONS AND VERIFIED
ANSWERS
The following must be marked on Site Maps in job site trailer as work
progresses. - Answers - The dates when BMP changes or additions take
place
the best location for portable toilets on your construction site is... - Answers
- on level ground in low construction traffic areas
The SWPPP implementation sequence may be modified.... - Answers -
after consulting with the project SWPPP designer (CEC) and, if required,
the project owner and receiving written approval.
True or false: The superintendent is responsible for keeping current contact
list of all parties involved with the project. - Answers - True
Storm drain inlet PROTECTION is often intended to... - Answers - retain
large quantities of sediment.
why is vegetation an important method for controlling erosion? - Answers -
-to increase water infiltration
-roots reinforce soil
-dissipates rainfall energy
when installing and maintaining a check dam make sure... - Answers - the
low point (overflow) of the check dam is in the middle of the channel
which of the following is NOT a beneficial use of water? - Answers -
flushing a spill down a storm drain
of the following, which is a primary erosion control objective? - Answers -
minimize the extent and duration of soil exposure-stabilize disturbed areas
quickly.
, soil stockpiles and other disturbed areas must receive... - Answers -
temporary stabilization if they will remain inactive for more than 14 days
and potentially fewer days depending on the jurisdiction.
in addition to worker verification and badging, what other employment
incidents and/or regulatory contacts may happen? - Answers -
immigration,E-verify, wages, harassment, discrimination and, joint
employment.
a fiber roll or wattle is intended to... - Answers - capture sediment from
slope and slow runoff velocity
runoff controls include all but which one of the following.. - Answers - rolled
erosion control products
the notice of termination can be filed when - Answers - all construction
activity, inside and outside the building, is complete and permanent
stabilization has been verified as adequate to meet permit requirements.
a key first step before installing a rolled erosion control product or RECP is
- Answers - properly preparing the ground surface
proper spill management should include all of the following except -
Answers - installation of a spill pit on your construction site
true or false: contractor shall at all time keep just and true books, records
and accounts at its facility showing the actual cost and expenses that
contractor incurs in connection with the work, owner or its duly authorized
representative shall have the right, during term of this contract and for two
years after the earlier of the completion of the work or termination of this
contract, to enter onto contractors facility to examine and audit the books,
records and accounts that pertain to this contract. - Answers - true
sediment control devices must be installed.. - Answers - down slope of
construction areas prior to starting land distributing activities
the stormwater notice of intent (NOI) must be submitted... - Answers - after
the SWPPP is prepared and before starting construction
ANSWERS
The following must be marked on Site Maps in job site trailer as work
progresses. - Answers - The dates when BMP changes or additions take
place
the best location for portable toilets on your construction site is... - Answers
- on level ground in low construction traffic areas
The SWPPP implementation sequence may be modified.... - Answers -
after consulting with the project SWPPP designer (CEC) and, if required,
the project owner and receiving written approval.
True or false: The superintendent is responsible for keeping current contact
list of all parties involved with the project. - Answers - True
Storm drain inlet PROTECTION is often intended to... - Answers - retain
large quantities of sediment.
why is vegetation an important method for controlling erosion? - Answers -
-to increase water infiltration
-roots reinforce soil
-dissipates rainfall energy
when installing and maintaining a check dam make sure... - Answers - the
low point (overflow) of the check dam is in the middle of the channel
which of the following is NOT a beneficial use of water? - Answers -
flushing a spill down a storm drain
of the following, which is a primary erosion control objective? - Answers -
minimize the extent and duration of soil exposure-stabilize disturbed areas
quickly.
, soil stockpiles and other disturbed areas must receive... - Answers -
temporary stabilization if they will remain inactive for more than 14 days
and potentially fewer days depending on the jurisdiction.
in addition to worker verification and badging, what other employment
incidents and/or regulatory contacts may happen? - Answers -
immigration,E-verify, wages, harassment, discrimination and, joint
employment.
a fiber roll or wattle is intended to... - Answers - capture sediment from
slope and slow runoff velocity
runoff controls include all but which one of the following.. - Answers - rolled
erosion control products
the notice of termination can be filed when - Answers - all construction
activity, inside and outside the building, is complete and permanent
stabilization has been verified as adequate to meet permit requirements.
a key first step before installing a rolled erosion control product or RECP is
- Answers - properly preparing the ground surface
proper spill management should include all of the following except -
Answers - installation of a spill pit on your construction site
true or false: contractor shall at all time keep just and true books, records
and accounts at its facility showing the actual cost and expenses that
contractor incurs in connection with the work, owner or its duly authorized
representative shall have the right, during term of this contract and for two
years after the earlier of the completion of the work or termination of this
contract, to enter onto contractors facility to examine and audit the books,
records and accounts that pertain to this contract. - Answers - true
sediment control devices must be installed.. - Answers - down slope of
construction areas prior to starting land distributing activities
the stormwater notice of intent (NOI) must be submitted... - Answers - after
the SWPPP is prepared and before starting construction