which of the following are examples of activities that are
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\
covered by the OSHA Steel Erections standards? -
|\ |\ |\ |\ |\ |\ |\ |\
CORRECT ANSWERS ✔✔bolting and bracing joists |\ |\ |\ |\ |\
installing metal decking |\ |\
welding structural steel |\ |\
installing ornamental iron |\ |\
which of the following are common potential hazards that
|\ |\ |\ |\ |\ |\ |\ |\ |\
result in fatalities during steel erection accidents? -
|\ |\ |\ |\ |\ |\ |\ |\
CORRECT ANSWERS ✔✔being struck by an object while
|\ |\ |\ |\ |\ |\ |\ |\
working under a load |\ |\ |\
walking on unsecured decking
|\ |\ |\
being struck while landing a load or making a connection
|\ |\ |\ |\ |\ |\ |\ |\ |\
You are performing a steel erection activity. Which of the
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\
following is a safety precaution you can take to reduce
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\
your risk of injury? - CORRECT ANSWERS ✔✔avoid
|\ |\ |\ |\ |\ |\ |\ |\
walking on any unsecured beams or joists
|\ |\ |\ |\ |\ |\
ensure fall protection systems are properly installed
|\ |\ |\ |\ |\ |\
Before proceeding with steel erection, the anchor bolt
|\ |\ |\ |\ |\ |\ |\ |\
repairs, replacements and modifications must be
|\ |\ |\ |\ |\ |\
, completed with the approval of the _______. - CORRECT |\ |\ |\ |\ |\ |\ |\ |\ |\
ANSWERS ✔✔project structural engineer |\ |\ |\
who is responsible for making sure there are adequate
|\ |\ |\ |\ |\ |\ |\ |\ |\
access roads into and through the site for the safe
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\
delivery and movement of derricks, cranes, trucks, and |\ |\ |\ |\ |\ |\ |\ |\
other equipment and materials? - CORRECT ANSWERS
|\ |\ |\ |\ |\ |\ |\
✔✔the controlling contractor |\ |\
The _______ must ensure that site layout requirements like
|\ |\ |\ |\ |\ |\ |\ |\
the means and methods for pedestrian and vehicular
|\ |\ |\ |\ |\ |\ |\ |\ |\
control are provided and maintained before any steel
|\ |\ |\ |\ |\ |\ |\ |\
erection activity is performed. - CORRECT ANSWERS |\ |\ |\ |\ |\ |\ |\
✔✔controlling contractor |\
All hoisting operations must be pre-planned to ensure
|\ |\ |\ |\ |\ |\ |\ |\
which of the following? - CORRECT ANSWERS ✔✔routes
|\ |\ |\ |\ |\ |\ |\ |\
used for hoisting loads do not require employees to work
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\
directly below a suspended load |\ |\ |\ |\
The most common cause of fatalities associated with
|\ |\ |\ |\ |\ |\ |\ |\
steel erection is: - CORRECT ANSWERS ✔✔improper use
|\ |\ |\ |\ |\ |\ |\ |\
of fall protection ??
|\ |\ |\