ASBESTOS BUILDING INSPECTOR TEST QUESTIONS AND
ANSWERS VERIFIED GUARANTEED SUCCESS
ACM stands for
Asbestos Containing Material
The operating agency for each public school building in which friable asbestos
containing materials have been identified shall monitor airborne asbestos levels in each
sampling area. For at least how many hours during a period of normal activity must this
monitoring be done?
it must be done for 8 hours
What portion of insurance coverage for medical exams and monitoring as required by
law must the contractor provide?
all of the cost
Responsibility for ACM control in a building is primarily that of the
owner
The category least suspected of releasing asbestos fibers into the air because of
friability is
miscellaneous products
,The program manager can speed up the sampling process when preparing for a
building inspection for asbestos by revealing ACM in the
blueprints
Before plastic barriers are set up, the work area should be
wet cleaned
What percentage of Federal, commercial, and residential construction before 1970
contained asbestos in pipe or boiler insulation?
20%
The efficiency of the negative air pressure unit or cabinet is determined by the
Magnehelic guage and the manometer
Disposal bags are primarily made of which type of plastic?
A minimum of 6 mil
A contractor must sign the contract and execute the bonds _____ days after being
awarded the bid
5 days
, What should be posted "in plain view" of workers at teh jobsite to ensure safety?
Emergency telephone numbers
For a negative air pressure unit or cabinet, what volt-power supply is needed?
115 volt
Assembly Bill 2040 requires warning signs to state
Danger- asbestos cancer and lung hazard- keep out!
Mesothelioma is a cancer of
the lining of the lungs
These are all true
During removal, asbestos must be wetted to keep down airborne fibers and there must
be no visible emission to the outside air.
After removal, asbestos must be kept wet, placed in leak tight containers with warning
labels, and transported to a State approved waste disposal site.
Proper work practices must be followed in renovation or demolition jobs involving at
least 260 lf of asbestos on pipes and at least 160sf on flat surfaces.
Asbestos may not be dropped on the ground, even if wetted
ANSWERS VERIFIED GUARANTEED SUCCESS
ACM stands for
Asbestos Containing Material
The operating agency for each public school building in which friable asbestos
containing materials have been identified shall monitor airborne asbestos levels in each
sampling area. For at least how many hours during a period of normal activity must this
monitoring be done?
it must be done for 8 hours
What portion of insurance coverage for medical exams and monitoring as required by
law must the contractor provide?
all of the cost
Responsibility for ACM control in a building is primarily that of the
owner
The category least suspected of releasing asbestos fibers into the air because of
friability is
miscellaneous products
,The program manager can speed up the sampling process when preparing for a
building inspection for asbestos by revealing ACM in the
blueprints
Before plastic barriers are set up, the work area should be
wet cleaned
What percentage of Federal, commercial, and residential construction before 1970
contained asbestos in pipe or boiler insulation?
20%
The efficiency of the negative air pressure unit or cabinet is determined by the
Magnehelic guage and the manometer
Disposal bags are primarily made of which type of plastic?
A minimum of 6 mil
A contractor must sign the contract and execute the bonds _____ days after being
awarded the bid
5 days
, What should be posted "in plain view" of workers at teh jobsite to ensure safety?
Emergency telephone numbers
For a negative air pressure unit or cabinet, what volt-power supply is needed?
115 volt
Assembly Bill 2040 requires warning signs to state
Danger- asbestos cancer and lung hazard- keep out!
Mesothelioma is a cancer of
the lining of the lungs
These are all true
During removal, asbestos must be wetted to keep down airborne fibers and there must
be no visible emission to the outside air.
After removal, asbestos must be kept wet, placed in leak tight containers with warning
labels, and transported to a State approved waste disposal site.
Proper work practices must be followed in renovation or demolition jobs involving at
least 260 lf of asbestos on pipes and at least 160sf on flat surfaces.
Asbestos may not be dropped on the ground, even if wetted