ACQ EXAM 1 REVISED QUESTIONS WITH CORRECT SOLUTIONS
1. What is the last activity in the Life Cycle process: Disposal
2. What are the responsibilities of the DACM: 1. Establish and monitor training requirements and DAWIA compliance
2. Certifies Dawia standards have been met
3. What are the 3 Risk factors: Cost, Performance, Schedule
4. What is required for an Acquisition: An Approved need
5. Systems Engineering is responsible for: integration throughout the entire life cycle
6. What is the GOV role in systems engineering: manage the total program meet user needs
translate operational need into a system performance specification
7. When can technology be introduced into the life cycle: At any point
8. Is a critical Acquisition position higher or lower on the pay grade: Higher
9. When does the JCIDS process occur: Before the acquisition process
10.What are the 3 steps to JCIDS methodology: Capabilities based assessment document of capability
needs review validation and approval
11. When is the Capabilities production Document (CPD) made: in the engineer- ing and manufacturing
development
phase for use at milestone C
12.Whos is responsible for the budgeting phase of PPBE: The Comptroller
13.Whos is responsible for the planning phase of PPBE: UnderSecDefense
1/
, 14.ACAT ID: Review by defense Aqc Board (DAB) R@D >365m Pdn>2.19b Chair USD
15.ACAT IC and II: Army System Acq requirements council (ASARC) R@D >140m Pdn>660m Chair ASALT
16.ACAT III: IPR chair PEO
17.What doc establishes thresholds of ACAT: DODI 5000.02
18.ACAT level enables identification of: Type of system level of
management applicable program reporting requirements
19.Who is the milestone authority for CAT ID: USD ATL
20.how many phases in the life cycle model: 5
21.which phase is LRIP in: 4 production and deployment
22.what are 2 reasons to initiate new technology: Take advantage of new tech-
nology react to an actual or potential threat
23.Integrated Product and Process Development Integrated Product and Process Development (IPPD) is: is a
management approach that integrates all activities from product concept through production/deployment and support
(Womb to Tomb)
24.(IPPD)Utilizes multifunctional teams to optimize:: Product Design
Manufacturing Business Processes Sustainment Processes
25.IPPD Benefits: Reduced product delivery time Reduced product
cost
Reduced risk Improved
quality
Improved response to customer needs
2/
1. What is the last activity in the Life Cycle process: Disposal
2. What are the responsibilities of the DACM: 1. Establish and monitor training requirements and DAWIA compliance
2. Certifies Dawia standards have been met
3. What are the 3 Risk factors: Cost, Performance, Schedule
4. What is required for an Acquisition: An Approved need
5. Systems Engineering is responsible for: integration throughout the entire life cycle
6. What is the GOV role in systems engineering: manage the total program meet user needs
translate operational need into a system performance specification
7. When can technology be introduced into the life cycle: At any point
8. Is a critical Acquisition position higher or lower on the pay grade: Higher
9. When does the JCIDS process occur: Before the acquisition process
10.What are the 3 steps to JCIDS methodology: Capabilities based assessment document of capability
needs review validation and approval
11. When is the Capabilities production Document (CPD) made: in the engineer- ing and manufacturing
development
phase for use at milestone C
12.Whos is responsible for the budgeting phase of PPBE: The Comptroller
13.Whos is responsible for the planning phase of PPBE: UnderSecDefense
1/
, 14.ACAT ID: Review by defense Aqc Board (DAB) R@D >365m Pdn>2.19b Chair USD
15.ACAT IC and II: Army System Acq requirements council (ASARC) R@D >140m Pdn>660m Chair ASALT
16.ACAT III: IPR chair PEO
17.What doc establishes thresholds of ACAT: DODI 5000.02
18.ACAT level enables identification of: Type of system level of
management applicable program reporting requirements
19.Who is the milestone authority for CAT ID: USD ATL
20.how many phases in the life cycle model: 5
21.which phase is LRIP in: 4 production and deployment
22.what are 2 reasons to initiate new technology: Take advantage of new tech-
nology react to an actual or potential threat
23.Integrated Product and Process Development Integrated Product and Process Development (IPPD) is: is a
management approach that integrates all activities from product concept through production/deployment and support
(Womb to Tomb)
24.(IPPD)Utilizes multifunctional teams to optimize:: Product Design
Manufacturing Business Processes Sustainment Processes
25.IPPD Benefits: Reduced product delivery time Reduced product
cost
Reduced risk Improved
quality
Improved response to customer needs