Geschreven door studenten die geslaagd zijn Direct beschikbaar na je betaling Online lezen of als PDF Verkeerd document? Gratis ruilen 4,6 TrustPilot
logo-home
Tentamen (uitwerkingen)

Test - CLM 017 Risk Management Exam UPDATED ACTUAL Questions and CORRECT Answers

Beoordeling
-
Verkocht
-
Pagina's
5
Cijfer
A+
Geüpload op
03-05-2026
Geschreven in
2025/2026

Test - CLM 017 Risk Management Exam UPDATED ACTUAL Questions and CORRECT Answers

Instelling
Science
Vak
Science

Voorbeeld van de inhoud

Test - CLM 017 Risk Management Exam UPDATED ACTUAL
Questions and CORRECT Answers


Which of the following is a good example of a framing -Schedule timeframe will be adequate to develop prototype and final product.
assumption (FA)? -Requirements will remain stable.
-System deficiencies will be identified and fixed.
-Contractors will offer mature designs that allow prototypes to be delivered in
five months.


Which of the following are attributes of a framing -No "work-arounds"
assumption (FA) in an acquisition program? (Select all -Critical
that apply.) -Foundational
-Program-specific


Who may write the Program Risk Process (PRP) -The program manager (PM) or a dedicated risk manager
Document? -The Program Executive Officer (PEO) or the Risk Management Board (RMB)
-The Risk Working Group or the Risk Management Board (RMB)
-The Program Executive Officer (PEO) or the Integrated Product Team (IPT)
management board




The following describes which sources of potential risk: -External factors and requirements
The software programming team is supposed to begin -Management and security
work in two months. The team has already been hired, but -Logistics and external factors
half of the team does not yet have their security -Human systems integration and security
clearance, and will not be able to start work on site until
they do.


Which of the following is a responsibility of the Integrated -Coordinate RM efforts for risks affecting multiple IPTs.
Product Team (IPT) during the risk management (RM) -Approve risk closure for IPT-level risks and notify the program RMB for
process? (I GOT THIS ANSWER WRONG) closure.
-Ensure the development of and approve the Program Risk Process (PRP)
Document.
-Brief the risk mitigation plan to the program or IPT Risk Management Board
(RMB) for approval.


Which of the following are the components of -Likelihood, level, consequence
opportunity management (OM)? -Level, priority, benefit
-Future root cause, probability, benefit
-Probability, cost, future root cause


During Engineering and Manufacturing Development -Cost/Funding
(EMD), risks should be identified related to critical -Threat
manufacturing process and key product characteristics in -Manufacturing
which of the following risk areas? (Select all that apply.) -Supply Chain

, Based on the results of a simulation, there is a 50% -Probability 5; Schedule Impact 2
chance that the project will end three weeks behind -Probability 2; Schedule Impact 2
schedule. Using the table provided, what would the -Probability 3; Schedule Impact 4
cumulative schedule risk be, based on a three-week -Probability 3; Schedule Impact 2
schedule delay?
Level Probability of Occurrence Schedule Impact
1 0% to 19% 0 to 5 days
2 20% to 39% 6 to 12 days
3 40% to 59% 13 to 19 days
4 60% to 79% 20 to 28 days
5 80% to 100% 29 to 35 days


You are reporting on the status of key risks to date at a -Risk information management system
progress meeting. Which of the following tools provides -(NOT THIS ONE)Earned value analysis
a visual display of the progress made to reduce key risks? -Waterfall effect
-Risk identification template


What would be the appropriate corrective action for the -Ignore
following issue: One of the orders for materials is going -Control
to run 75% over budget because the order will have to be -Avoid
shipped by air to meet schedule requirements. The -Transfer
budgeting team may be able to find funds from other
sources.


Why are Monte Carlo simulations used in program -To determine the shortest path to complete the project
schedule analysis? -To find the cumulative effect of multiple risks on total project schedule
duration or total project cost
-To identify the various decision points of the project so you know which tasks
need more attention than others
-To determine the most logical path for task completion for a successful project


You have contracted a university research team to create -Product Work Breakdown Structure (WBS) Risk Analysis
a new optic lens as a part of your program's satellite -Expert interviews
system. Your group has never worked with this team -Lessons learned
before, and has included a new potential risk stemming -Process Risk Analysis
from their development and testing procedures. What
type of analysis could you use to identify and reduce
specific risks from their processes?




Which of the following is important for good -(NOT THIS ONE)Weekly meetings to coordinate RM efforts.
government/contractor coordination of risk management -A shared RM database.
(RM)? -(NOT THIS ONE)Shared responsibilities to manage identified risks.
-Common approaches to addressing risk.

Geschreven voor

Instelling
Science
Vak
Science

Documentinformatie

Geüpload op
3 mei 2026
Aantal pagina's
5
Geschreven in
2025/2026
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

$11.99
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
MGRADES Stanford University
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
1378
Lid sinds
2 jaar
Aantal volgers
105
Documenten
86856
Laatst verkocht
1 dag geleden
MGRADES (Genius Brains)

Welcome to MGRADES Exams, practices and Study materials The work speaks for itself Me and my team will always make sure you get the best value from the exams markets. I offer the best study and exam materials for a wide range of courses and units. Make your study sessions more efficient and effective. Dive in and discover all you need to excel in your academic journey!

3.8

230 beoordelingen

5
94
4
50
3
51
2
14
1
21

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen