GUIDE 2026/2027 ACCURATE QUESTIONS
WITH CORRECT DETAILED SOLUTIONS ||
100% GUARANTEED PASS
<NEWEST VERSION>
1. Failure to maintain OSHA logs could result in a base penalty of ? -
ANSWER ✔ $1000
2. The minimum number of employees that will require a contractor to obtain
workmen's compensation insurance is ? - ANSWER ✔ 1 employee
3. The type of bond that guarantees that the contractor is I'll perform the work
in accordance with the contract is know as a ? bond - ANSWER ✔
Performance Bond
4. Short term project schedule is detailed explanation of the next two weeks of
construction activities and should be developed and or reviewed by all the
following except ? - ANSWER ✔ Architect
5. The ? usually prepares the project schedule - ANSWER ✔ Project manager
6. In order to provide adequate control the project schedule should be formally
reviewed and updated - ANSWER ✔ At least once every 30 days
7. A contract will not be enforced if it is ? - ANSWER ✔ Illegal
8. According to the statute of frauds a contract need not be in writing and still
be enforceable in Florida if it is ? - ANSWER ✔ Less than $500 in value
and less than 1 year in length
,9. The ? has the duty to record and post a Notice of Commencement to
improve real property - ANSWER ✔ Owner
10.A subcontractor started work on his contract with the General Contractor on
August 1 1999 The owner made the final payment to the general contractor
on September 13 1999 The latest date the subcontractor can serve a notice to
preserve his claim under the Conatitution Lein Law is what date and when ?
- ANSWER ✔ September 13 1999 or day before payment
11.The type of contract we are in the contractor agrees to carry out stipulated
job in exchange for a fix some of the money is a? Contract - ANSWER ✔
Lump sum
12.When a contractor has to perform extra work for a subcontractor he will
recover the cost in the form of a? - ANSWER ✔ Back charge
13.The ? Should be jointly prepared with the material and equipment schedule -
ANSWER ✔ Project schedule
14.All of the following must follow the OSHA standards except_______.
A. Religious Establishments
B. General contractor with one employee
C. Landscape contractors
D. Equipment rental business - ANSWER ✔ A. Religious
Establishments
15.The number of employees that will require a contractor to obtain workman's
compensation insurance is _____ or more full or part time employee(s).
A. One
B. Three
C. Four
D. Ten - ANSWER ✔ A. One
16.The type of bond that guarantees that the contractor will perform the work in
accordance with the contract is known as a _____ Bond
A. Bid
B. Payment
C. Performance
, D. Stipulated - ANSWER ✔ C. Performance
17.Of the following, which one is not included in the scope of a certified alarm
system contractor?
A. Alarm circuits not originating in the alarm panel
B. Wiring for data transmission circuits that do not exceed 98 volts
(RMS)
C. Satellite systems that are not a part of a community antenna television
distribution system.
D. Fire Alarm systems - ANSWER ✔ A. Alarm circuits not originating
in the alarm panel
18.The right to repossess or replevy unused materials from a jobsite will not be
effective if someone, in good faith, purchased it after removal from the site
of the improvement. - ANSWER ✔ True.
19.The contractor must within _____ days after the receipt of the property
owner's request, furnishish to property owner or the property owner's agent a
list of the subcontractors and suppliers who have a contract with the
contractor as of the date the request is received by the contractor. -
ANSWER ✔ 10 days.
20.A property perfected lien may be discharged by an order of the circuit court
of the _____ where the property is located. - ANSWER ✔ county
21.When any interested party files a complaint, the clerk will issue a summons
to the lienor to show cause within _____ days why his or her lien should not
to be enforced by action or vacated and canceled of record. - ANSWER ✔
20 days
22.If a lienor fails to show cause why his or her lien should not be enforced or
fails to start such action before the return date of the summons, the court will
immediately order cancellation of the lien. - ANSWER ✔ True
23.No lien provided by part 713.22 will continue for longer then ____ years
after the claim of lien has been recorded. - ANSWER ✔ 1 year
, 24.No lien provided by part 713.22 will continue for no longer then _______
years after the recording of an amended claim of lien that shows a later date
of final furnishing of labor, services, or materials. - ANSWER ✔ 1 year
25.The lien of any lienor upon whom Notice of contest of Lien is served and
who fails to institute a suit to enforce his or her lien within ________ days
after service of such notice will be extinguished automatically. - ANSWER
✔ 60
26.The payment bond is required to ______ an owner under s. 713.23 must be
furnished by the contractor in at least the amount of the original contract
price before commencing the construction of the improvement under the
direct contract. - ANSWER ✔ exempt
27.A copy the payment bond must be attached to the Notice of Commencement
when it is _______. - ANSWER ✔ recorded
28.Anyone who willfully files a fraudulent lien as defined in 713.31 commits a
felony of the ______ degree - ANSWER ✔ third
29.When a construction project is "put out" for bid, the contractors are given
the plans and specifications for the project. If any deviations for these
specifications occur, who will be held responsible and may be required to
correct them at their own expense? - ANSWER ✔ The contractor
30.The ______ for a protect are interpreted as a legal document that specifically
defines the responsibilities of the owner and his representatives intended for
the project and what the contractors responsibilities are. - ANSWER ✔
specifications
31.The CSI-MASTERFORMAT divides the specifications into __________
specific divisions to provide a standard reference and filing numbers for
bidding and contract forms. - ANSWER ✔ 50
32.Which of the following would appear as a heading in the index of the
General Clauses and Conditions sections of General Requirements? -
ANSWER ✔ All of these ( General Conditions, Notice to Bidders and
Proposal)