Incorrect
Status: Passed!!
Questions & answers
, 1. If mechanical equipment
breaks down. 2. Pavement not a
as soon as the concrete can support
principal highway and width
the sawing equipment.
does not exceed 16 ft. 3. Area
has regular dimensions.
shrinkage cracking before concrete is placed
Don't know?
2 of 155
Term
3 reasons the use of backing material in bottom of a joint is required
Give this one a try later!
True 45 degree
sawing after concrete has cured,
1. control depth sealant 2.
installation of an approved
achieve shape form 3. support
removable joint device, installation of
sealant against indentation and
an approved permanent joint
sag
former/sealer device
Don't know?
,3 of 155
, Term
T/F All scales must be accurate to .5% throughout the entire range of
use
Give this one a try later!
false True
15 feet smooth
Don't know?
4 of 155
Term
2 ways joint formed in concrete pavent
Give this one a try later!
vibrating and screeding finishing and polishing
rolling and tamping sawing and joint forming device