Section A: Federal Regulations (AHERA, NESHAP, OSHA)
Question 1
Which federal law specifically requires schools to develop asbestos
management plans?
A) Clean Air Act
B) AHERA
C) TSCA
D) OSHA 1926.1101
Correct answer: B
Rationale: AHERA (Asbestos Hazard Emergency Response Act) mandates
asbestos surveys and management plans for K-12 schools (public and
non-profit private).
Question 2
Under AHERA, the asbestos management plan for a school must be
reviewed and updated at least:
, A) Every 6 months
B) Once a year
C) Every 3 years
D) Only when a renovation occurs
Correct answer: B
Rationale: AHERA requires an annual review of the management plan to
reflect current conditions and any response actions taken. This is separate
from the 3-year reinspection.
Question 3
The NESHAP for asbestos primarily regulates which of the following?
A) Water discharge
B) Air emissions from demolition and renovation
C) Soil contamination
D) Noise levels
Correct answer: B
Rationale: NESHAP (National Emission Standards for Hazardous Air
Pollutants) limits airborne asbestos fiber emissions during demolition and
renovation activities.
Question 4
OSHA 29 CFR 1926.1101 applies to which work environment?
A) Residential homes
B) Construction sites
C) Agricultural fields
, D) Office buildings
Correct answer: B
Rationale: This OSHA standard governs asbestos handling specifically in
the construction industry, including demolition, renovation, repair, and
maintenance.
🔹 Section B: Pennsylvania State Requirements (Act 194)
Question 5
Under Pennsylvania Act 194, who must be certified to conduct
asbestos inspections?
A) Any licensed contractor
B) Certified Asbestos Inspector (CAI)
C) Building owner
D) EPA-registered firm
Correct answer: B
Rationale: Pennsylvania Act 194 requires that individuals performing
asbestos inspections hold a Certified Asbestos Inspector (CAI) certification.
Question 6
Which document must be submitted to the Pennsylvania Department
of Labor & Industry for plan approval?
A) Site-specific asbestos management plan
B) Building permit
, C) Hazardous waste manifest
D) Air quality permit
Correct answer: A
Rationale: The completed asbestos management plan is reviewed and
approved by PA’s Department of Labor & Industry before implementation.
🔹 Section C: Management Planner Core Responsibilities
Question 7
What is the primary responsibility of an asbestos management
planner?
A) Collect bulk samples of suspect materials
B) Perform final clearance air monitoring
C) Assess hazards and develop an Operations & Maintenance (O&M) plan
D) Design asbestos abatement projects
Correct answer: C
Rationale: The planner evaluates inspection reports, assesses hazard
potential, and develops the written management plan – including O&M
procedures. Sampling is done by the inspector; abatement design by the
project designer.
Question 8
What document must a management planner review before making
recommendations?
Examination Practice Questions And Correct
Answers (Verified Answers) Plus Rationales
2025|2026 Q&A | Instant Download Pdf
Section A: Federal Regulations (AHERA, NESHAP, OSHA)
Question 1
Which federal law specifically requires schools to develop asbestos
management plans?
A) Clean Air Act
B) AHERA
C) TSCA
D) OSHA 1926.1101
Correct answer: B
Rationale: AHERA (Asbestos Hazard Emergency Response Act) mandates
asbestos surveys and management plans for K-12 schools (public and
non-profit private).
Question 2
Under AHERA, the asbestos management plan for a school must be
reviewed and updated at least:
, A) Every 6 months
B) Once a year
C) Every 3 years
D) Only when a renovation occurs
Correct answer: B
Rationale: AHERA requires an annual review of the management plan to
reflect current conditions and any response actions taken. This is separate
from the 3-year reinspection.
Question 3
The NESHAP for asbestos primarily regulates which of the following?
A) Water discharge
B) Air emissions from demolition and renovation
C) Soil contamination
D) Noise levels
Correct answer: B
Rationale: NESHAP (National Emission Standards for Hazardous Air
Pollutants) limits airborne asbestos fiber emissions during demolition and
renovation activities.
Question 4
OSHA 29 CFR 1926.1101 applies to which work environment?
A) Residential homes
B) Construction sites
C) Agricultural fields
, D) Office buildings
Correct answer: B
Rationale: This OSHA standard governs asbestos handling specifically in
the construction industry, including demolition, renovation, repair, and
maintenance.
🔹 Section B: Pennsylvania State Requirements (Act 194)
Question 5
Under Pennsylvania Act 194, who must be certified to conduct
asbestos inspections?
A) Any licensed contractor
B) Certified Asbestos Inspector (CAI)
C) Building owner
D) EPA-registered firm
Correct answer: B
Rationale: Pennsylvania Act 194 requires that individuals performing
asbestos inspections hold a Certified Asbestos Inspector (CAI) certification.
Question 6
Which document must be submitted to the Pennsylvania Department
of Labor & Industry for plan approval?
A) Site-specific asbestos management plan
B) Building permit
, C) Hazardous waste manifest
D) Air quality permit
Correct answer: A
Rationale: The completed asbestos management plan is reviewed and
approved by PA’s Department of Labor & Industry before implementation.
🔹 Section C: Management Planner Core Responsibilities
Question 7
What is the primary responsibility of an asbestos management
planner?
A) Collect bulk samples of suspect materials
B) Perform final clearance air monitoring
C) Assess hazards and develop an Operations & Maintenance (O&M) plan
D) Design asbestos abatement projects
Correct answer: C
Rationale: The planner evaluates inspection reports, assesses hazard
potential, and develops the written management plan – including O&M
procedures. Sampling is done by the inspector; abatement design by the
project designer.
Question 8
What document must a management planner review before making
recommendations?