The Clean Water Act The 1970s federal law that set into place the
regulation of stormwater.
NPDES Requirements for managing storm water activity
on a construction site.
The Notice of Termination (NOT) All construction activity (inside and outside) is
can be filed when complete and permanent stabilization has been
verified as adequate to meet permit
requirements.
All of the following must occur 4. Submit the Notice of Termination (NOT).
before construction starts, except:
1. Prepare the SWPPP
2. Determine the Operator(s)
3. Submit the Notice of Intent (NOI)
4. Submit the Notice of Termination
(NOT)
, Which of the following is NOT a 3. Flushing a spill down a storm drain.
beneficial use of water?
1. Swimming
2. Drinking
3. Flushing a spill down a storm
drain
4. Industrial and agricultural water
supply
When installing and maintaining a 3. The low point (overflow) of the check dam is in
check dam, make sure: the middle of the channel.
1. Stormwater is directed around the
check dam
2. Void spaces are filled with
sediment
3. The low point (overflow) of the
check dam is in the middle of the
channel
4. The high point of the check dam
is in the middle of the channel
To reduce the possibility of 3. Install filter fabric under rock and similar
undercutting in channels, you materials placed within the stormwater
should: conveyance.
1. Stabilize diversions and swales
within 21-days of construction
2. Add mulch and straw
3. Install filter fabric under rock and
similar materials placed within the
stormwater conveyance
4. Never install a BMP in a
stormwater conveyance
EXAM QUESTIONS AND VERIFIED ANSWERS
/GET IT 100% ACCURATE|ALREADY GRADED A+
Save
Terms in this set (35)
The Clean Water Act The 1970s federal law that set into place the
regulation of stormwater.
NPDES Requirements for managing storm water activity
on a construction site.
The Notice of Termination (NOT) All construction activity (inside and outside) is
can be filed when complete and permanent stabilization has been
verified as adequate to meet permit
requirements.
All of the following must occur 4. Submit the Notice of Termination (NOT).
before construction starts, except:
1. Prepare the SWPPP
2. Determine the Operator(s)
3. Submit the Notice of Intent (NOI)
4. Submit the Notice of Termination
(NOT)
, Which of the following is NOT a 3. Flushing a spill down a storm drain.
beneficial use of water?
1. Swimming
2. Drinking
3. Flushing a spill down a storm
drain
4. Industrial and agricultural water
supply
When installing and maintaining a 3. The low point (overflow) of the check dam is in
check dam, make sure: the middle of the channel.
1. Stormwater is directed around the
check dam
2. Void spaces are filled with
sediment
3. The low point (overflow) of the
check dam is in the middle of the
channel
4. The high point of the check dam
is in the middle of the channel
To reduce the possibility of 3. Install filter fabric under rock and similar
undercutting in channels, you materials placed within the stormwater
should: conveyance.
1. Stabilize diversions and swales
within 21-days of construction
2. Add mulch and straw
3. Install filter fabric under rock and
similar materials placed within the
stormwater conveyance
4. Never install a BMP in a
stormwater conveyance