1.
The PRIMARY purpose of a bridge inspection is to:
A. Improve aesthetics
B. Ensure structural safety and serviceability
C. Increase traffic speed
D. Reduce maintenance costs only
Answer: B
Bridge inspections ensure safety and structural integrity.
2.
What does NBIS stand for?
A. National Bridge Inspection Standards
B. National Building Inspection System
C. Network Bridge Infrastructure Safety
D. New Bridge Inspection Service
Answer: A
NBIS governs bridge inspection requirements in the U.S.
3.
,What is the standard inspection frequency for most bridges under NBIS?
A. Every year
B. Every 2 years
C. Every 5 years
D. Every 10 years
Answer: B
Routine inspections are typically biennial.
4. (Case Scenario)
A bridge shows severe corrosion on steel girders with section loss.
The inspector should:
A. Ignore minor corrosion
B. Document and recommend immediate evaluation
C. Paint over corrosion
D. Close inspection report
Answer: B
Section loss affects load capacity and safety.
5.
What is “section loss” in steel members?
A. Increased thickness
B. Reduction in cross-sectional area due to corrosion
C. Expansion of metal
D. Surface discoloration only
Answer: B
Section loss reduces structural capacity.
6.
,Which component primarily transfers loads from bridge deck to supports?
A. Guardrails
B. Beams/girders
C. Lighting poles
D. Signage
Answer: B
Girders carry structural loads.
7.
What is spalling in concrete?
A. Color change
B. Flaking or breaking of concrete surface
C. Moisture absorption
D. Surface polishing
Answer: B
Spalling indicates deterioration.
8.
What is delamination in concrete decks?
A. Surface cracking
B. Separation of concrete layers
C. Reinforcement corrosion
D. Color fading
Answer: B
Delamination weakens structural integrity.
9.
What is the MAIN cause of reinforcing steel corrosion in concrete?
, A. Dry conditions
B. Chloride intrusion and moisture
C. UV exposure
D. Wind load
Answer: B
Chlorides cause rebar corrosion.
10.
What is fatigue cracking in steel bridges?
A. Instant failure
B. Progressive cracking due to repeated stress cycles
C. Thermal expansion
D. Surface rust
Answer: B
Fatigue develops over time under cyclic loads.
11.
What is the purpose of load rating?
A. Design new bridges
B. Determine safe load-carrying capacity
C. Increase traffic flow
D. Reduce maintenance
Answer: B
Load rating ensures safe operation.
12.
What is scour at bridge foundations?