Study Guide exam with comprehensive questions and well
elaborated correct answers graded A+
Professional Academic Assistance Services
Services Offered
Proctored Exam Assistance
Online Class Management (Full Course Support)
Exam Preparation & Study Materials
Assignments and Coursework Support
Essays and Research Papers
Discussion Posts and Replies
According to state regulation, Texas Department of Licensing and Regulation (TDLR), a Mold Assessment
Consultant (MAC) renewing their license must fill out the online application. When and at what time
would the MAC be required to send TDLR a copy of the certificate? - correct ans:Only if audited
, According to state regulation TDLR, how is the stop date defined? - correct ans:The date following a day
on which final clearance is achieved following a mold remediation project
According to state regulation TDLR, the initial mold assessment consultant training course shall be at
least how long? - correct ans:40 hours
According to state regulations TDLR , a mold assessment technician is not licensed to do what? - correct
ans:Develop a mold management plan
According to state regulation TDLR, what type of pressure would a walk in containment require? -
correct ans:The pressure inside a walk-in containment must be lower than the pressure in the building
areas adjacent to the containment.
According to state regulation TDLR, signs advising that a mold remediation project is in progress shall
bear what words? - correct ans:Notice; Mold remediation in project in progress
According to state regulation TDLR, signs should be a minimum of how many inches by how many
inches? - correct ans:8 X 10
According to state regulation TDLR, for a remediation to achieve clearance, who shall conduct a post
remediation assessment using a visual, procedural, and analytical methods? - correct ans:Mold
Assessment Consultant
According to state regulation TDLR, not later than how long after completion of a mold remediation
project, the licensed mold remediation contractor or company shall provide the property owner with
copies of required photographs of the scene of the mold remediation taken before and after the
remediation? - correct ans:10 calendar days Versus working days
According to state regulation TDLR, not later than how many days after the project stop date, is the
licensed mold remediation contractor or company shall provide a certificate of mold damage
remediation to the property owner on a form adopted by the Texas Commissioner of Insurance? -
correct ans:10 calendar days