Asphalt Plant Technician Certification Exam
COMPLETE VERIFIED QUESTIONS AND DETAILED
SOLUTIONS LATEST UPDATE .pdf
Who cuts the density cores used for verification testing?
The verification technician
The contractor
The independent verification testing technician
None of the above - Answer-The contractor
A full lot is composed of 5 sublots and 4 cores per lot T/F -
Answer-False
What is the most important for consistent compaction of
asphalt mix?
The mix is hotter in temperature
The mix is colder in temperature
The mix is uniform in temperature
Temperature of the mix does not affect compaction -
Answer-The mix is uniform in temperature
,2|Page
Referring to general stationing guidelines, R1 would be
____ than R2
Closer to centerline
Closer to outside shoulder
Closure to the inside shoulder
Both A and C - Answer-Both A and C
A full lot of super pave asphalt is what size?
1,000 tons
1,000 to 2000 tons
2000 to 4000 tons
1 days production - Answer-2000 to 4000 tons
Which is not typically used as an asphalt binder in fdot mix
designs?
PG 52-28
PG 58-22
PG 62-22
PG 76-22(PMA)
PG 82-22 (PMA) - Answer-PG 62-22
, 3|Page
While using the rolling straightedge, if the needle goes in
the red zone indicating an unacceptable high spot in the
section, you then - Answer-Mark the pavement where the
needle first goes into the red zone and place another mark
where the needle leaves the red zone and continue
For bridge approach slabs, the 15 foot manual
straightedge should be set so ____ is on the bridge deck.
1 inch
Exactly 1/2 of the straightedge
The entire straightedge
None of the above - Answer-1 inch
For the first transverse joint on a project place the ___ on
the new pavement while overlapping the transverse joint
by one inch.
4 foot level
15 foot manual straight edge
Rolling straightedge
All the above - Answer-15 foot manual straight edge