Test w/air or inert gas like nitrogen, never _________.
Give this one a try later!
oxygen
The low point in the system to collect condensate & allow for removal is called the
____________.
, Give this one a try later!
drip leg
Vents must terminate w/an approved cap that is installed to meet
____________________________________.
Give this one a try later!
Manufacturers' instructions
If the system serves more than one building, a ____________ shall be installed outside at
each building.
Give this one a try later!
shutoff
Vents must rise a minimum of ____ feet ___________ & ____ feet above any part of the building
w/in ____ feet.
Give this one a try later!
5 - vertically - 2 - 10
Give this one a try later!
oxygen
The low point in the system to collect condensate & allow for removal is called the
____________.
, Give this one a try later!
drip leg
Vents must terminate w/an approved cap that is installed to meet
____________________________________.
Give this one a try later!
Manufacturers' instructions
If the system serves more than one building, a ____________ shall be installed outside at
each building.
Give this one a try later!
shutoff
Vents must rise a minimum of ____ feet ___________ & ____ feet above any part of the building
w/in ____ feet.
Give this one a try later!
5 - vertically - 2 - 10