Preparing a bid request includes B
which of the following:
A. Verifying References.
B. Identifying potential contractors.
C. Recommending a contractor to
the board.
D. Verifying contractor insurance.
Legal review prior to executing a D
contract will assist the association in
the event that:
A. A subcontractor is used.
B. A performance bond is required.
C. There is a budgetary shortfall.
D. The board has questions or
concerns.
, Rather than describing the scope of A
work in detail in the contract, a
manager may:
A. Attach the bid specifications.
B. Call each contractor to describe
the job.
C. Be on-site to oversee project
content.
D. Suggest the board meet the
contractor to talk about the scope
of work.
In older condominiums, an D
association should have what type
of contract covering mechanical
equipment?
A. Time and materials
B. Specific repair
C.Service
D. Preventative maintenance
For which project would a board B
most likely want to use a consultant
to help develop bid specifications?
A.Landscape renovation project
B. Repairing and/or replacing roofs
C. Painting the interior of lobbies
and hallways
D. Repairing HVAC and boilers
QUESTIONS AND VERIFIED ANSWERS
Save
Terms in this set (30)
Preparing a bid request includes B
which of the following:
A. Verifying References.
B. Identifying potential contractors.
C. Recommending a contractor to
the board.
D. Verifying contractor insurance.
Legal review prior to executing a D
contract will assist the association in
the event that:
A. A subcontractor is used.
B. A performance bond is required.
C. There is a budgetary shortfall.
D. The board has questions or
concerns.
, Rather than describing the scope of A
work in detail in the contract, a
manager may:
A. Attach the bid specifications.
B. Call each contractor to describe
the job.
C. Be on-site to oversee project
content.
D. Suggest the board meet the
contractor to talk about the scope
of work.
In older condominiums, an D
association should have what type
of contract covering mechanical
equipment?
A. Time and materials
B. Specific repair
C.Service
D. Preventative maintenance
For which project would a board B
most likely want to use a consultant
to help develop bid specifications?
A.Landscape renovation project
B. Repairing and/or replacing roofs
C. Painting the interior of lobbies
and hallways
D. Repairing HVAC and boilers