Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Exam (elaborations)

VIRGINIA HIC EXAM|COMPLETE STUDY GUIDE| PRACTICE QUESTIONS AND VERIFIED ANSWERS

Rating
-
Sold
-
Pages
14
Grade
A+
Uploaded on
06-05-2026
Written in
2025/2026

VIRGINIA HIC EXAM|COMPLETE STUDY GUIDE| PRACTICE QUESTIONS AND VERIFIED ANSWERS What is the MAXIMUM penalty for a contractor who undertakes work without the proper class of license? - ANSWER️$500 fine per day for each day of violation plus penalties for a misdemeanor. All Class A contractor licensure applications MUST include - ANSWER️information on the knowledge, skills, and abilities of the applicant. How MUST rafters be framed to each other? - ANSWER️With a gusset plate. What is the MAXIMUM flame spread index for insulation materials? - ANSWER️25 Flexible (batts) insulation placed in floor joists above an unheated crawl space should - ANSWER️be well supported between joists. Using which of the following would cause the GREATEST increase in the insulation value when re-siding with aluminum? - ANSWER️Perforated reflector foil What is the MAXIMUM distance between a ventilating opening in an under-floor space and each corner of the building? - ANSWER️3 feet What is the MAXIMUM dimension of the ventilation coverings for under-floor space? - ANSWER️1/4 inch. Attic spaces should - ANSWER️be vented for summer heat relief. What is the MINIMUM square footage of net clear opening area for an egress window in a second floor sleeping area? - ANSWER️5.70 square feet. How is the hand of a door determined? - ANSWER️By the location of the hinges when the door is viewed from the inside. Which window type consists of an upper and a lower sash that slide vertically in the side jambs? - ANSWER️Double-hung. The owner requests for changes which will cost the contractor $15,000 in labor and materials and $2,250 in overhead costs. With the change, the contractor would be relieved of $18,000 in labor and materials costs, and $2,400 in overhead costs from the original contract. The original bid included profit of 20% of all costs. The contractor wants to make a profit of 20% of all costs on the changes. The adjusted contract price for the change order should be - ANSWER️a decrease of $3,780. The escape devices for a trench over 4 feet deep MUST be within a MAXIMUM of - ANSWER️25 feet of the worker. What is the MINIMUM breaking strength required of safety belt lanyards? - ANSWER️5,400 pounds. Material stored inside a building under construction MUST be a MINIMUM of how many feet of an inside floor opening? - ANSWER️6 feet. An employer MUST post a citation for a Virginia OSHA violation near the place of violation for a MINIMUM of how many days? - ANSWER️3 days. What is the MINIMUM illumination for general construction area lighting - ANSWER️5 foot candles. The definition of "flame spread" is - ANSWER️the propagation of flame over a surface. Debris materials that are dropped more than 20 feet to a container outside a structure MUST be - ANSWER️dropped through a chute. How much is the Class A initial license fee? - ANSWER️$200 A licensee's name change MUST be reported to the Board within a MAXIMUM of how many days? - ANSWER️30 days According to the Board Rules and Regulations, a full-time employee is one who works a MINIMUM of how many hours per week? - ANSWER️30 hours. A firm desiring to be licensed as a Class B contractor MUST have a MINIMUM net worth of - ANSWER️$15,000. What is the name of the process when a facilitator meets with the major participants in a project, prior to the commencement of the project, to identify the shared goals of all participants? - ANSWER️Partnering A cost plus contract calls for the contractor to receive direct costs for labor and materials, and a markup of 20% of direct costs. The contractor is also to receive a bonus of 15% of savings if total cost to the owner is less than $80,000, and a bonus of $1,000 per day if the project is completed early. Final costs for direct labor and materials are $60,000. The project is completed 3 days early. What is the total amount due the contractor? - ANSWER️Between $75,001 and $80,000 In general, what is the MINIMUM concrete covering for steel reinforcement in a footing? - ANSWER️3.0 inches. A concrete block foundation wall that is adequately braced should be cured for a MINIMUM of how much time before backfilling? - ANSWER️48 hours.

Show more Read less
Institution
VIRGINIA HIC
Course
VIRGINIA HIC

Content preview

VIRGINIA HIC EXAM|COMPLETE STUDY
GUIDE| PRACTICE QUESTIONS AND
VERIFIED ANSWERS




What is the MAXIMUM penalty for a contractor who undertakes work without the proper class
of license? - ANSWER✔️$500 fine per day for each day of violation plus penalties for a
misdemeanor.

All Class A contractor licensure applications MUST include - ANSWER✔️information on the
knowledge, skills, and abilities of the applicant.

How MUST rafters be framed to each other? - ANSWER✔️With a gusset plate.

What is the MAXIMUM flame spread index for insulation materials? - ANSWER✔️25

Flexible (batts) insulation placed in floor joists above an unheated crawl space should -
ANSWER✔️be well supported between joists.

, Using which of the following would cause the GREATEST increase in the insulation value when
re-siding with aluminum? - ANSWER✔️Perforated reflector foil

What is the MAXIMUM distance between a ventilating opening in an under-floor space and
each corner of the building? - ANSWER✔️3 feet

What is the MAXIMUM dimension of the ventilation coverings for under-floor space? -
ANSWER✔️1/4 inch.

Attic spaces should - ANSWER✔️be vented for summer heat relief.

What is the MINIMUM square footage of net clear opening area for an egress window in a
second floor sleeping area? - ANSWER✔️5.70 square feet.

How is the hand of a door determined? - ANSWER✔️By the location of the hinges when the door
is viewed from the inside.

Which window type consists of an upper and a lower sash that slide vertically in the side jambs?
- ANSWER✔️Double-hung.

The owner requests for changes which will cost the contractor $15,000 in labor and materials and
$2,250 in overhead costs. With the change, the contractor would be relieved of $18,000 in labor
and materials costs, and $2,400 in overhead costs from the original contract. The original bid
included profit of 20% of all costs. The contractor wants to make a profit of 20% of all costs on
the changes. The adjusted contract price for the change order should be - ANSWER✔️a decrease
of $3,780.

The escape devices for a trench over 4 feet deep MUST be within a MAXIMUM of -
ANSWER✔️25 feet of the worker.

What is the MINIMUM breaking strength required of safety belt lanyards? - ANSWER✔️5,400
pounds.

Material stored inside a building under construction MUST be a MINIMUM of how many feet
of an inside floor opening? - ANSWER✔️6 feet.

An employer MUST post a citation for a Virginia OSHA violation near the place of violation for
a MINIMUM of how many days? - ANSWER✔️3 days.

What is the MINIMUM illumination for general construction area lighting - ANSWER✔️5 foot-
candles.

The definition of "flame spread" is - ANSWER✔️the propagation of flame over a surface.

Written for

Institution
VIRGINIA HIC
Course
VIRGINIA HIC

Document information

Uploaded on
May 6, 2026
Number of pages
14
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

$12.49
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Get to know the seller
Seller avatar
profryan

Get to know the seller

Seller avatar
profryan Harvard University
Follow You need to be logged in order to follow users or courses
Sold
-
Member since
3 months
Number of followers
0
Documents
66
Last sold
-
Core Subject Mastery Notes

Your go-to study resource for Nursing, Economics, Biology, and History. Get comprehensive, exam-focused notes across multiple core subjects. My materials are clear, well-organized, and designed to help you study smarter and ace your exams. Whether you're tackling anatomy, economic theory, cellular processes, or historical events I've got you covered. Study smarter. Save time. Succeed.

0.0

0 reviews

5
0
4
0
3
0
2
0
1
0

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions