Nicet Highway Construction Level 1 and 2 Exam Questions and Answers

Instelling
Nicet Highway Construction Level 1
Vak
Nicet Highway Construction Level 1

Voorbeeld van de inhoud

Nicet Highway Construction Level 1 and 2 8l 8l 8l 8l 8l 8l



Study online at https://quizlet.com/_ekcryw
8l 8l 8l




1. 3 Types of Blueprint Views: 1. Plan View 2. Elevation or Profile View 3. Cross-Section View
8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l




2. What is Plan View?: View fromabove 8l 8l 8l 8l 8l 8l




3. What is the profile view?: View from the front or the side
8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l




4. What is the cross-section view?: A view as if the object has been cut open
8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l




5. What is the first sheet in a set of project plans?: Title orkey sheet
8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l




6. What do typical section sheets show?: They show the ditterent layers of the road and side slopes and
8l 8l 8l 8l 8l 8 l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l




ditches for a particular given length.
8l 8l 8l 8l 8l




7. What is a plan detail?: A detail is a view of a very specific item of work
8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l




8. T/F Typical Section Sheets show elevation views of the proposed road.: False. Th
8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l




e answer is "Profile Sheets"
8l 8l 8l 8l




9. The shape of the road's side slopes and ditches are found on which sheet?-
8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l




: "Typical Section Sheets"
8l 8l 8l




10. T/F The directional arrow is found on the "Profile Sheet": False."PlanSheets"also calle
8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l




d "Key Sheet"
8l 8l




11. Which sheet depicts the cross- 8 l 8 l 8 l 8 l




section view of the road superimposed on the natural ground line?: Cross-
8 l 8 l 8 l 8 l 8 l 8 l 8l 8l 8l 8l 8l




Section sheets. 8l




12. What is the diameter, in inches, of a #8, Re-Bar?: 8dividedby8=1.00"
8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l




13. Station 21+00 is what distance from Station 23+00?: 200 8l 8l 8l 8l 8l 8l 8l 8l




14. Is 21+00 Up Station or Back Station from 23+00?: Back Station
8l 8l 8l 8l 8l 8l 8l 8l 8l 8l




15. What is "Cross-Slope"?: Cross-slope is defined as the transverse slope with respect to the horizon
8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l




16. What is surveying?: the profession or work of examining and recording the area and features of a piece of lan
8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l




d so as to construct a map, plan, or detailed description of it
8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l




17. What is Geodectic Surveying?: It is that type of surveying in which the curved shape of earth is taken
8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l




into account.8l




18. What is a level in surveying used for?: A level is a telescope instrument used to set slope stakes, check t
8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l




he level of forms or field elevations / grades.
8l 8l 8l 8l 8l 8l 8l 8l




19. What is the difference between a Transit vs a Level / Laser?: ATransit can be tilted verti
8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l




cally to measure vertical angles.
8l 8l 8l 8l




20. What is a "Plumb Bob"?: A "Plumb Bob" is a weighted object connected to a string that can be used to esta
8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l




blish a vertical line. It is used to calculate horizontal distances over sloping ground in conjunction with a surveying tape.
8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l




18l/8l20

, Nicet Highway Construction Level 1 and 2 8l 8l 8l 8l 8l 8l



Study online at https://quizlet.com/_ekcryw
8l 8l 8l




21. What is a "Survey Rod"?: A survey rod reads like a tape measure. It allows the surveyor to record an obser
8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l




ved number so that an elevation can be determined.
8l 8l 8l 8l 8l 8l 8l 8l




22. What is a Vernier?: A "Vernier" is used on a survey rod and is used to determine the subdivision of the small
8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l




est division of the smallest division of a scale.
8l 8l 8l 8l 8l 8l 8l 8l




23. Can the terms "Transit" and "Level" be used synonymously?: No.ATransitcan meas
8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l




ure vertical angles whereas a level cannot.
8l 8l 8l 8l 8l 8l




24. When looking through a level, what are the 4 different hair lines that you
8 l 8 l 8 l 8 l 8 l 8 l 8 l 8 l 8 l 8 l 8 l 8 l 8 l




will see called?: Upper Stadia, Middle Cross / Middle Stadia, Lower Stadia and Vertical Cross.
8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l




25. What are Benchmarks?: Benchmarks are fixed exact points where an exact elevation is know.
8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l




26. What is "Back Sight"?: Back Sight is a rod reading taken on a point of know elevation.
8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l




27. What is "Height of Instrumentation": (HI) is the elevation of the line of sight projected by the instru
8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l




ment.
28. What is "Fore Sight" (FS)?: Foresight is a rod reading taken on any point to determine it's elevation.
8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l




29. What is "Turning Point" (TP)?: Turning Point is a reliable point upon which a foresight is taken to establ
8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l




ish elevation.
8l




30. A steel tape is used to measure the length between points "A" & "B" and t
8 l 8 l 8 l 8 l 8 l 8 l 8 l 8 l 8 l 8 l 8 l 8 l 8 l 8 l 8l




he distance is found to be 95'. The temperature of the tape at the time of m
8 l 8 l 8 l 8 l 8 l 8 l 8 l 8 l 8 l 8 l 8 l 8 l 8 l 8 l 8 l 8l




easurement is 45 degrees (F). If the tape is calibrated for 68 degrees (F) and no o 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8 l 8 l




ther factors are to be considered, is the measurement correct? Short or long?
8 l 8 l 8 l 8 l 8 l 8 l 8 l 8 l 8 l 8 l 8 l 8l 8l




Why?: The measurement will be too long. The tape shrunk due to the cold and principles of "Coeflcient of Expansi
8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8 l 8l




on".
31. What is the typical tension required on a 100' steel tape?: 25 LBS
8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l




32. If a steel tape is held "off-
8l 8l 8l 8l 8l 8l




line", is the measurement accurate?: No. When measuring, tapes must be held on-
8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l




line, if not, errors will occur in the actual measurement.
8l 8l 8l 8l 8l 8l 8l 8l 8l




33. Name the 9 most common errors that occur when measuring with tapes.: -
8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l




Length other than standard, improper plumbing, temperature other than standard, poor alignment, tape not being horiz
8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l




ontal (level), sagging, faulty marking, incorrect reading or interpolation.
8l 8l 8l 8l 8l 8l 8l 8l




34. What are Catch Points?: CP occur at the intersection of the existing ground and the constructed grade. The a
8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l




mount of cut or fill is determined by the ditterence between the roadway elevation and the original ground elevation.
8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l




35. Name the 3 types of Contour Lines.: Index, Intermediate and Supplementary.
8l 8l 8l 8l 8l 8l 8l 8l 8l 8l




28l/8l20

, Nicet Highway Construction Level 1 and 2 8l 8l 8l 8l 8l 8l



Study online at https://quizlet.com/_ekcryw
8l 8l 8l




36. What is the definition of Contour Lines?: A Contour Line connects all points of equal elevation, abov
8l 8l 8l 8l 8l 8l 8 l 8l 8l 8l 8l 8l 8l 8l 8l 8l




e or below a known or assumed reference point or plane.
8l 8l 8l 8l 8l 8l 8l 8l 8l 8l




37. How is a depression shown on a Topo Map?: Hachure or tick marks that are on the inside of co
8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l




ntour circles denote a depression.
8l 8l 8l 8l




38. What are the "4 Rules" of Contour Lines?: 1. All points along the same contour line are on the sa
8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l




me elevation. 2. All contour lines eventually connect. 3. Contour lines never cross each other. 4. Contour lines never split
8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l




39. What instrument is used to determine the area of a Topo Map?: Plainmeter 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l




40. The farther contour lines are apart, the 8 l the slope.: Flatter or less. 8 l 8 l 8 l 8 l 8 l 8 l 8l 8l 8l 8l




41. T or F? When determining elevation of an Intermediate Contour line alway
8 l 8 l 8 l 8 l 8 l 8 l 8 l 8 l 8 l 8 l 8 l




s start at the furthest Index Contour line.: False. Startat the closest Index Contour.
8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l




42. Define "Benchmark".: A Benchmark is a fixed exact point where an exact elevation is known.
8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l




43. T/F? Slope & drainage is always calculated parallel to the contour lines.: False. Per
8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l




pendicular.
44. In soil testing, the test used to determine the ratio of the weight of a given vol
8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l




ume of material to the weight of an equal volume water is known as?: Density Check
8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l




45. What is the water cement ratio?: Weightofwater/weightofcement. 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l




46. What is "Wet Sieve": Used to separate fine grain from coarse grain. It carried out by washing the soil spe
8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l




cimen on a 60pm sieve mesh. 8l 8l 8l 8l 8l




47. Slump test of concrete tests all but which of the following? Water / cemen 8 l 8 l 8 l 8 l 8 l 8 l 8 l 8 l 8 l 8 l 8 l 8 l 8 l




t ratio, admixture content, strength, durability & workability, water content.: -
8l 8l 8l 8l 8l 8l 8l 8l 8l 8l




Strength.
8l




48. For a concrete slump test, how is the cone to be filled with concrete?: In3equal laye
8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l l8 l8 8l




rs.
49. What is the "Critical Path" method?: It's the fastest a project can be completed. It does not inclu
8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l




de any float days. 8l 8l 8l




50. Drainage always occurs?: Perpendicular (at right angle) to the contour lines. 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l




51. 25% of what number is 10?: 10/.25=40 8l 8l 8l 8l 8l 8l 8l 8l 8l




52. 40 is 80% of what number?: 40/.80=50 8l 8l 8l 8l 8l 8l 8l 8l 8l




53. The PH value of a liquid will indicate what?: Whether the liquid is acid or base.
8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l 8l




38l/8l20

Geschreven voor

Instelling
Nicet Highway Construction Level 1
Vak
Nicet Highway Construction Level 1

Documentinformatie

Geüpload op
7 mei 2026
Aantal pagina's
20
Geschreven in
2025/2026
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

$15.99
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
blessedstuvia stuvia
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
20
Lid sinds
1 jaar
Aantal volgers
0
Documenten
1464
Laatst verkocht
3 maanden geleden
EDUCATOR1

If you need any examination materials dealing with cases or exams or testbanks just reach me..dont panic, am here to help you ace you exams just leave a review after purchasing my documents best of luck

4.0

2 beoordelingen

5
1
4
0
3
1
2
0
1
0

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen