PJM GENERATION CERT ACTUAL 2026
QUESTIONS AND VERIFIED ANSWERS
Save
Terms in this set (271)
Actions in low voltage alert? Review transmission & generation outages
Request reactive reserve check
Heavy load voltage schedule Bulk Power System
warning purpose is to have
members prepare far max support
of voltages on the?
Manual load dump warning & Primary reserve is less the the largest generating
reduction of Non-critical plant load unit.
issued when? Loss of transmission facility jeopardize reliability
after all possible measures have been taken to
increase reserves
Hot weather alert COMED 90
DOM & EKPC 95
PJM issues high system voltage Gen operators should operate the lower end of
message their voltage bandwidth
Primary reserve warning Ensure deffer able Maintenance is halted
, General actions PJM takes when Purchase/load additional reserves
conservating ops initiated? begin studying double contingencies
Lower IROL
Increase # of SOS calls
Purpose of heavy voltage schedule EHV system
action is to increase reactive
reserves
National terrorism advisory system Elevated threat
2 types of alerts? Imminent threat
Non-critical plant load lighting, office area a/c
Purpose of capacity emergency keep members informed of actual capacity
warning? shortages or contingencies that may jeopardize
reliability during RT ops
keep all affected system personnel aware of the
forecast and actual status of the PJM RTO
Heavy load voltage schedule Gen operators- maintain MVAR reserve on units
action connected to EHV
During cold weather action Assume an unavailability rate for scheduled
generation
During terrorism/sabotage Operations & communications
emphasis on?
For voltage support TOs can Generators stay online
request?
QUESTIONS AND VERIFIED ANSWERS
Save
Terms in this set (271)
Actions in low voltage alert? Review transmission & generation outages
Request reactive reserve check
Heavy load voltage schedule Bulk Power System
warning purpose is to have
members prepare far max support
of voltages on the?
Manual load dump warning & Primary reserve is less the the largest generating
reduction of Non-critical plant load unit.
issued when? Loss of transmission facility jeopardize reliability
after all possible measures have been taken to
increase reserves
Hot weather alert COMED 90
DOM & EKPC 95
PJM issues high system voltage Gen operators should operate the lower end of
message their voltage bandwidth
Primary reserve warning Ensure deffer able Maintenance is halted
, General actions PJM takes when Purchase/load additional reserves
conservating ops initiated? begin studying double contingencies
Lower IROL
Increase # of SOS calls
Purpose of heavy voltage schedule EHV system
action is to increase reactive
reserves
National terrorism advisory system Elevated threat
2 types of alerts? Imminent threat
Non-critical plant load lighting, office area a/c
Purpose of capacity emergency keep members informed of actual capacity
warning? shortages or contingencies that may jeopardize
reliability during RT ops
keep all affected system personnel aware of the
forecast and actual status of the PJM RTO
Heavy load voltage schedule Gen operators- maintain MVAR reserve on units
action connected to EHV
During cold weather action Assume an unavailability rate for scheduled
generation
During terrorism/sabotage Operations & communications
emphasis on?
For voltage support TOs can Generators stay online
request?