For edges not along longitudinal joints, the surface within the 6 inches adjacent
| | | | | | | | | | | | |
to the edge shall not vary more than - CORRECT ANSWER✔✔-1/4"
| | | | | | | | | |
Conventional forms will not be required at slab edges along longitudinal joints,
| | | | | | | | | | | |
provided the surface within the 6 inch width adjacent to the edge does not vary
| | | | | | | | | | | | | | |
more than - CORRECT ANSWER✔✔-1/8"
| | | |
Texturing of the concrete is to be done using a _______ and a ________ texturing
| | | | | | | | | | | | | |
device - CORRECT ANSWER✔✔-carpet drag; metal tine
| | | | | | |
The carpet drag must be reasonably free from indentions over - CORRECT
| | | | | | | | | | | |
ANSWER✔✔-1/16" deep |
In slip form paving, the drag is usually attached to the - CORRECT ANSWER✔✔-
| | | | | | | | | | | | |
longitudinal float machine | |
Two approved methods of floating are - CORRECT ANSWER✔✔-mechanical and
| | | | | | | | | |
hand held |
The longitudinal tube float is set at a __ angle to the centerline of the slab. -
| | | | | | | | | | | | | | | | |
CORRECT ANSWER✔✔-45 degree | |
,Following the mechanical, longitudinal tube float, the _____________ float may
| | | | | | | | | |
be used to smooth and fill open textured pavement areas. - CORRECT
| | | | | | | | | | | |
ANSWER✔✔-hand held |
The vibratory, longitudinal bull float is only used - CORRECT ANSWER✔✔-over
| | | | | | | | | | |
joints
T/F Excess water and loose material should be removed from the surface with a
| | | | | | | | | | | | | |
10 foot, metal, static straightedge. - CORRECT ANSWER✔✔-True
| | | | | | |
T/F The handle of a straightedge must be approximately 5 foot longer than 1/2
| | | | | | | | | | | | | |
the width of the pavement slab. - CORRECT ANSWER✔✔-False
| | | | | | | |
T/F When working the straightedge, the blade is first worked at a 45 degree angle
| | | | | | | | | | | | | |
to the centerline and then with the blade parallel to the centerline. - CORRECT
| | | | | | | | | | | | | | |
ANSWER✔✔-True
T/F The straightedge operations should advance along the concrete slab in
| | | | | | | | | | |
successive stages of 5 feet. - CORRECT ANSWER✔✔-True
| | | | | | |
T/F When performing straightedge operations, water may be thrown on the
| | | | | | | | | | |
surface to make the work easier. - CORRECT ANSWER✔✔-False
| | | | | | | |
If the application of water to the concrete surface is permitted during finishing
| | | | | | | | | | | | |
operations, it shall be applied as - CORRECT ANSWER✔✔-fog spray
| | | | | | | | |
, Screeds yield the _____ grade of the concrete slab - CORRECT ANSWER✔✔-initial
| | | | | | | | | | |
_________ finishing will be required on all highway pavements or _____,
| | | | | | | | | | |
regardless of width. - CORRECT ANSWER✔✔-Machine; ramps
| | | | | |
Under what conditions will hand finishing be permitted? - CORRECT ANSWER✔✔-
| | | | | | | | | |
1. If mechanical equipment breaks down. 2. Pavement not a principal highway
| | | | | | | | | | | |
and width does not exceed 16 ft. 3. Area has regular dimensions.
| | | | | | | | | | |
T/F A strike off bar is used to level the concrete. - CORRECT ANSWER✔✔-True
| | | | | | | | | | | | |
T/F Prior to concrete placement and the paver in place, th DOTD Inspector should
| | | | | | | | | | | | |
use a string line to make sure the strike off is true to line. - CORRECT
| | | | | | | | | | | | | | | | |
ANSWER✔✔-True
T/F A toothed rake is used for leveling concrete. - CORRECT ANSWER✔✔-False
| | | | | | | | | | |
T/F Vibrators must be operated at least 20 seconds in each place. - CORRECT
| | | | | | | | | | | | | |
ANSWER✔✔-False
T/F Over vibration of the concrete mixture will cause the mortar to rise to the top
| | | | | | | | | | | | | | |
surface of the pavement slab. - CORRECT ANSWER✔✔-True
| | | | | | | |
With Correct Answers
For edges not along longitudinal joints, the surface within the 6 inches adjacent
| | | | | | | | | | | | |
to the edge shall not vary more than - CORRECT ANSWER✔✔-1/4"
| | | | | | | | | |
Conventional forms will not be required at slab edges along longitudinal joints,
| | | | | | | | | | | |
provided the surface within the 6 inch width adjacent to the edge does not vary
| | | | | | | | | | | | | | |
more than - CORRECT ANSWER✔✔-1/8"
| | | |
Texturing of the concrete is to be done using a _______ and a ________ texturing
| | | | | | | | | | | | | |
device - CORRECT ANSWER✔✔-carpet drag; metal tine
| | | | | | |
The carpet drag must be reasonably free from indentions over - CORRECT
| | | | | | | | | | | |
ANSWER✔✔-1/16" deep |
In slip form paving, the drag is usually attached to the - CORRECT ANSWER✔✔-
| | | | | | | | | | | | |
longitudinal float machine | |
Two approved methods of floating are - CORRECT ANSWER✔✔-mechanical and
| | | | | | | | | |
hand held |
The longitudinal tube float is set at a __ angle to the centerline of the slab. -
| | | | | | | | | | | | | | | | |
CORRECT ANSWER✔✔-45 degree | |
,Following the mechanical, longitudinal tube float, the _____________ float may
| | | | | | | | | |
be used to smooth and fill open textured pavement areas. - CORRECT
| | | | | | | | | | | |
ANSWER✔✔-hand held |
The vibratory, longitudinal bull float is only used - CORRECT ANSWER✔✔-over
| | | | | | | | | | |
joints
T/F Excess water and loose material should be removed from the surface with a
| | | | | | | | | | | | | |
10 foot, metal, static straightedge. - CORRECT ANSWER✔✔-True
| | | | | | |
T/F The handle of a straightedge must be approximately 5 foot longer than 1/2
| | | | | | | | | | | | | |
the width of the pavement slab. - CORRECT ANSWER✔✔-False
| | | | | | | |
T/F When working the straightedge, the blade is first worked at a 45 degree angle
| | | | | | | | | | | | | |
to the centerline and then with the blade parallel to the centerline. - CORRECT
| | | | | | | | | | | | | | |
ANSWER✔✔-True
T/F The straightedge operations should advance along the concrete slab in
| | | | | | | | | | |
successive stages of 5 feet. - CORRECT ANSWER✔✔-True
| | | | | | |
T/F When performing straightedge operations, water may be thrown on the
| | | | | | | | | | |
surface to make the work easier. - CORRECT ANSWER✔✔-False
| | | | | | | |
If the application of water to the concrete surface is permitted during finishing
| | | | | | | | | | | | |
operations, it shall be applied as - CORRECT ANSWER✔✔-fog spray
| | | | | | | | |
, Screeds yield the _____ grade of the concrete slab - CORRECT ANSWER✔✔-initial
| | | | | | | | | | |
_________ finishing will be required on all highway pavements or _____,
| | | | | | | | | | |
regardless of width. - CORRECT ANSWER✔✔-Machine; ramps
| | | | | |
Under what conditions will hand finishing be permitted? - CORRECT ANSWER✔✔-
| | | | | | | | | |
1. If mechanical equipment breaks down. 2. Pavement not a principal highway
| | | | | | | | | | | |
and width does not exceed 16 ft. 3. Area has regular dimensions.
| | | | | | | | | | |
T/F A strike off bar is used to level the concrete. - CORRECT ANSWER✔✔-True
| | | | | | | | | | | | |
T/F Prior to concrete placement and the paver in place, th DOTD Inspector should
| | | | | | | | | | | | |
use a string line to make sure the strike off is true to line. - CORRECT
| | | | | | | | | | | | | | | | |
ANSWER✔✔-True
T/F A toothed rake is used for leveling concrete. - CORRECT ANSWER✔✔-False
| | | | | | | | | | |
T/F Vibrators must be operated at least 20 seconds in each place. - CORRECT
| | | | | | | | | | | | | |
ANSWER✔✔-False
T/F Over vibration of the concrete mixture will cause the mortar to rise to the top
| | | | | | | | | | | | | | |
surface of the pavement slab. - CORRECT ANSWER✔✔-True
| | | | | | | |