◉VPDES Permit/Construction GP authorizes discharge of stormwater
from construction activities that are. Answer: greater than or equal to an
acre
◉The Stormwater Management Act requires the State Water Control
Board to. Answer: permit, regulate, and control stormwater runoff
◉DEQ has ___ days to complete review of real or potential inter-
jurisdictional impacts upon request. Answer: 90
◉The Stormwater Management Act requires the following individuals to
obtain and maintain a certificate of competency. Answer: staff of a
stormwater program, anyone contracted by a VSMP authority, standard
and specification holders
◉The dual certificate will expire three years from. Answer: the latest
date of the certificates
,◉SWM plan must be approved by ___ before land disturbance. Answer:
VSMP program authority
◉The water quality criteria sets a site-based load limit of ____ of total
phosphorus for new development. Answer: 0.41 lbs/acre/year
◉The phosphorus load limit uses the. Answer: 10% impervious cover
◉Part II B and II C water quantity criteria addresses. Answer: channel
protection and flood protection
◉Which two plans in the SWPPP must be approved?. Answer: SWM
plan, ESC plan
◉Does the SWM plan address runoff during or after construction?.
Answer: post-construction
◉What is the lower limit of the range of imperviousness that can result
in stream degradation?. Answer: 10%
◉What do land disturbing activities consist of?. Answer: excavating,
clearing, grading
, ◉LDA threshold for the SWM Act and Regulation. Answer: 1 acre or
2500 square feet for Chesapeake Bay Preservation Act
◉In situations where an initial exemption was applicable because LDAs
were related to emergency work, VSMP authority shall be advised of the
disturbance within. Answer: 7 days of commencing the LDA and shall
submit a permit application within 30 days of starting the land-
disturbing activity
◉Localities with MS4. Answer: must adopt and administer a stormwater
program
◉Localities without MS4. Answer: may choose to administer a VSMP
or have DEQ administer the program
◉DEQ is responsible for enforcing the ____ while locality ____ are
responsible for enforcing local ordinances. Answer: Construction GP,
VSMP
◉A locality VSMP authority must include enforcement authority and a
schedule of civil penalties for enforcement actions in its local ordinance.
The maximum penalty the authority may issue is. Answer: $32,500 per
violation per day