GOP must notify TOP of change in reactive capability how quick - ANS.... -30
minutes
TOP should return from unknown operating state how quick - ANS.... -30
minutes
IROL Tv should be less than or equal to... (System should be returned to IROL
within this time frame of exceeding) - ANS.... -30 minutes
Common standard time period for station battery to handle outage of AC power
to chargers - ANS.... -8-12 hours
Time to restore data exchange redundancy when redundancy testing by
RC/TOP/BA deemed unsuccessful - ANS.... -2 hours
Transition period to backup control facility (fully functioning) - ANS.... -2 hours
Annual testing of backup control facility must prove to be functional for this long
- ANS.... -2 hours
Every 2 years TO/TOP/DSP must provide how many hours of system restoration
training to field switching personnel - ANS.... -2 hours
, Every 2 years GOP's with blackstart resources shall provide how many hours of
training to operating personnel responsible for startup - ANS.... -2 hours
BAL-002 default contingency reserve restoration period (following disturbance
recovery period) - ANS.... -90 minutes
How often should BA calculate and record inadvertent interchange - ANS.... -60
minutes/hourly
How often should BA provide MW-hour meter readings to adjacent BA's - ANS....
-60 minutes/hourly
TLR procedure (identifying TLR level and actions to be implemented) needs
updating how often - ANS.... -60 minutes/hourly
Hourly ATC for next 48 hours calculated how often - ANS.... -60 minutes/hourly
During EEA2/3 the energy deficient entity needs to update the RC how often until
alert is terminated - ANS.... -60 minutes/hourly
DOE-417 (disturbance reporting) should be completed by when - ANS.... -60
minutes
BA with loss of resources must submit RFI with start time no more than how far
beyond the resource loss - ANS.... -60 minutes