SAP S/4HANA FULL LIST (TS410 EXAM) ACTUAL
2026 QUESTIONS AND VERIFIED ANSWERS
Save
Terms in this set (213)
What are the scope of a planning -Regenerative Planning
run? -Net Change for Total Horizon
What is the purpose of Material -the elimination of locking and increase
Ledger? throughput for standard pricing for material
valuation
-improved and flexible valuation methods in
multiple currencies and parallel accounting
What is the output of an MRP run? -Planned Order
-Purchase Req for Dependent Requirements
-Reservation for Dependent Items
What is the master data need for - Location
Adv. Planning? - Product
- Resource
List the Options for Running MRP? - Total Planning
- Single Item Planning Multilevel
- Single Item Planning Single Level
- Single Item Planning Interactive
, What is the difference between the Stock Req - Real Time / Dynamic
stock requirements list and the MRP MRP List - Static / Frozen
list?
What is the difference between MRP - planned on requirements (future, current,
MRP and Consumption Based forecast)
Planning? CBP - planning on historical data (historical)
What does a work center control? Standard Values
Scheduling
Capacity
Costing
Cost Center
Formulas
Activity Types
What is the result of a completion - Progress of the order / status update
confirmation? - GR partial or final
- Time Activity Update
- Scrap leftover material
What happens, on the Stock - planned order converts to production order
Requirements List, when a planned - BOM + routing is copied from planned order to
order is converted to a production production order
order for the finished product:
What happens, on the Stock - reservations for dependent components
Requirements List, when a planned
order is converted to a production
order for the components:
What is a standard cost estimate -Determine the sales price
used for? - Update the standard price in material master
- Calculate the planned cost in a production
order
2026 QUESTIONS AND VERIFIED ANSWERS
Save
Terms in this set (213)
What are the scope of a planning -Regenerative Planning
run? -Net Change for Total Horizon
What is the purpose of Material -the elimination of locking and increase
Ledger? throughput for standard pricing for material
valuation
-improved and flexible valuation methods in
multiple currencies and parallel accounting
What is the output of an MRP run? -Planned Order
-Purchase Req for Dependent Requirements
-Reservation for Dependent Items
What is the master data need for - Location
Adv. Planning? - Product
- Resource
List the Options for Running MRP? - Total Planning
- Single Item Planning Multilevel
- Single Item Planning Single Level
- Single Item Planning Interactive
, What is the difference between the Stock Req - Real Time / Dynamic
stock requirements list and the MRP MRP List - Static / Frozen
list?
What is the difference between MRP - planned on requirements (future, current,
MRP and Consumption Based forecast)
Planning? CBP - planning on historical data (historical)
What does a work center control? Standard Values
Scheduling
Capacity
Costing
Cost Center
Formulas
Activity Types
What is the result of a completion - Progress of the order / status update
confirmation? - GR partial or final
- Time Activity Update
- Scrap leftover material
What happens, on the Stock - planned order converts to production order
Requirements List, when a planned - BOM + routing is copied from planned order to
order is converted to a production production order
order for the finished product:
What happens, on the Stock - reservations for dependent components
Requirements List, when a planned
order is converted to a production
order for the components:
What is a standard cost estimate -Determine the sales price
used for? - Update the standard price in material master
- Calculate the planned cost in a production
order