PMT 4800V Practice Exam Questions With
Correct Answers
What is used to create the Acquisition Program Baseline?
Defense Acquisition Visibility Environment (DAVE)
For a mass-production system, the majority of a system's life cycle costs
can be attributed directly to
Operations and Support Costs
Which technical review is required for a successful Milestone B prior to
the Engineering and Manufacturing Development Phase and occurs
when all major design issues have been resolved in the system
preliminary design and work can begin on detailed design?
Preliminary Design Review (PDR)
Which of the following is a mandatory evaluation factor in every source
selection?
,Cost
Select the document that establishes policies and procedures for
developing, reviewing, validating and approving the capability
documents required by the Joint Capabilities Integration and
Development System (JCIDS).
Chairman of the Joint Chiefs of Staff Instruction (CJCSI) 5123.01
A software costing method that uses a team of experts working both
independently and together to combine different approaches and arrive
at a collective judgment through consensus is an example of the
_________ costing method.
Delphi
You have been assigned to lead a new program. Your first order of
business is to introduce team members and set expectations to
establish the team. In which stage of the team life cycle process are you
operating?
Forming
,During the Operational Test (OT) effort, the purpose of validation is to
determine ________________.
Whether or not we have "built the right thing"
The _______ includes details of processes, procedures, and materials
used in fabrication and is usually controlled by the contractor.
Product Baseline
Which of the following performance-based metrics assesses Materiel
Reliability?
Mean Time Between Failures (MTBF)
What two key values are identified for each performance parameter in
the Capability Development Document (CDD) to bound the design of
the system, yet provide the Program Manager with flexibility to design
the system according to the user's needs?
Thresholds and Objectives
, The approved detail design resulting from the __________ serves as a
basis for making the decision to begin the fabrication of production
representative prototype systems.
Critical Design Review (CDR)
Should-cost is described as:
Controlling the cost of actual work and finding ways to spend less than
funding estimates.
Which document establishes a flexible management framework for
translating approved capability needs and technology opportunities into
stable, affordable, and well managed acquisition programs?
DoDI 5000.02, Operation of the Adaptive Acquisition Framework
A design that optimizes ease and economy of fabrication and assembly
would be considered:
Producible
Correct Answers
What is used to create the Acquisition Program Baseline?
Defense Acquisition Visibility Environment (DAVE)
For a mass-production system, the majority of a system's life cycle costs
can be attributed directly to
Operations and Support Costs
Which technical review is required for a successful Milestone B prior to
the Engineering and Manufacturing Development Phase and occurs
when all major design issues have been resolved in the system
preliminary design and work can begin on detailed design?
Preliminary Design Review (PDR)
Which of the following is a mandatory evaluation factor in every source
selection?
,Cost
Select the document that establishes policies and procedures for
developing, reviewing, validating and approving the capability
documents required by the Joint Capabilities Integration and
Development System (JCIDS).
Chairman of the Joint Chiefs of Staff Instruction (CJCSI) 5123.01
A software costing method that uses a team of experts working both
independently and together to combine different approaches and arrive
at a collective judgment through consensus is an example of the
_________ costing method.
Delphi
You have been assigned to lead a new program. Your first order of
business is to introduce team members and set expectations to
establish the team. In which stage of the team life cycle process are you
operating?
Forming
,During the Operational Test (OT) effort, the purpose of validation is to
determine ________________.
Whether or not we have "built the right thing"
The _______ includes details of processes, procedures, and materials
used in fabrication and is usually controlled by the contractor.
Product Baseline
Which of the following performance-based metrics assesses Materiel
Reliability?
Mean Time Between Failures (MTBF)
What two key values are identified for each performance parameter in
the Capability Development Document (CDD) to bound the design of
the system, yet provide the Program Manager with flexibility to design
the system according to the user's needs?
Thresholds and Objectives
, The approved detail design resulting from the __________ serves as a
basis for making the decision to begin the fabrication of production
representative prototype systems.
Critical Design Review (CDR)
Should-cost is described as:
Controlling the cost of actual work and finding ways to spend less than
funding estimates.
Which document establishes a flexible management framework for
translating approved capability needs and technology opportunities into
stable, affordable, and well managed acquisition programs?
DoDI 5000.02, Operation of the Adaptive Acquisition Framework
A design that optimizes ease and economy of fabrication and assembly
would be considered:
Producible