10:4: Give an example of design specification?
Give this one a try later!
A slab of certain dimension is to be constructed using the specified
dimensions reinforcement bars and the grade of cement. If all instructions
are followed then the desired results will be obtained but if not then the
results will be inadequate
, 10:3: What is the significance or value of using the CSI format in preparing the tech
specs for a building project?
Give this one a try later!
Organizing the tech specification in the CSI format enable easier reference
and better understanding of the quality standards required for the
construction project
14:2: Why are provisions included in contracts that state time is of the essence?
Give this one a try later!
Other contracts may start at a particular date so the contractor needs to
complete the current project at hand and the owner might need the
building at a certain date.
13:2: By contract, what must be done by the contractor to ensure that payment will be
received for performing work required by a change condition?
Give this one a try later!
The GC has to stop work immediately and notify the owner and cannot
start work again until the owner has investigated this claim.
9:4: Give an example of an irregular or nonconforming bid
Give this one a try later!
Give this one a try later!
A slab of certain dimension is to be constructed using the specified
dimensions reinforcement bars and the grade of cement. If all instructions
are followed then the desired results will be obtained but if not then the
results will be inadequate
, 10:3: What is the significance or value of using the CSI format in preparing the tech
specs for a building project?
Give this one a try later!
Organizing the tech specification in the CSI format enable easier reference
and better understanding of the quality standards required for the
construction project
14:2: Why are provisions included in contracts that state time is of the essence?
Give this one a try later!
Other contracts may start at a particular date so the contractor needs to
complete the current project at hand and the owner might need the
building at a certain date.
13:2: By contract, what must be done by the contractor to ensure that payment will be
received for performing work required by a change condition?
Give this one a try later!
The GC has to stop work immediately and notify the owner and cannot
start work again until the owner has investigated this claim.
9:4: Give an example of an irregular or nonconforming bid
Give this one a try later!