Guide with Questions and Verified
Answers | Guarantee Pass
1. What is meant by the term "two blocking"?
a. Placing blocks under the outrigger beams.
b. The load block contacts the boom point sheaves.
c. Stacking loads on top of one another.
d. The load strikes the boom while swinging. - ANSWER b. The load
block contacts the boom point sheaves.
2. Lifting 20,000 lbs with a 2-leg bridle sling at a 30° horizontal sling angle,
what is the force applied to each leg?
a. 10,000 pounds
b. 20,000 pounds
c. 30,000 pounds
d. 40,000 pounds - ANSWER b. 20,000 pounds
3. Two cranes are lifting 100 tons. If crane A has 40% of the load, how much
weight will crane B have on its hook?
a. 60,000 lbs
b. 80,000 lbs
c. 120,000 lbs
d. 240,000 lbs - ANSWER a. 60,000 lbs
4. To CONFIRM the rated capacity of a specific sling, consult the
manufacturer's:
a. Sling chart
b. Website
c. Sling tag
, d. Catalog - ANSWER c. Sling tag
5. OSHA regulations require hook replacement if the opening exceeds what
percentage of its original throat opening?
a. 10%
b. 15%
c. 18%
d. 20% - ANSWER b. 15%
6. At what percentage of increase in length should a chain sling be removed
from service?
a. 2%
b. 3%
c. 4%
d. 5% - ANSWER d. 5%
7. The methodical process that attempts to identify hazards and devise plans to
overcome or eliminate hazards which may interfere with crane or rigging is
called:
a. Operators manual
b. Maintenance manual
c. Lift plan
d. Site analysis - ANSWER c. Lift plan
8. What provides additional control of a load being lifted?
a. Wire rope
b. Tag lines
c. Eye bolts
d. Chain hoist - ANSWER b. Tag lines
9. When traveling on a rubber tire mobile crane, how should the boom be
positioned?
, a. Over the side of the crane
b. Lowered on the boom rest
c. In a boom dolly
d. In line with the direction of travel - ANSWER d. In line with the
direction of travel
10.Before performing pick and carry operations with any mobile crane, it is
important to:
a. Check lights
b. Verify the sling angle is less than 30 degrees
c. Assure boom is facing down hill
d. Refer to the manufacturer's capacity chart - ANSWER d. Refer to the
manufacturer's capacity chart
11.According to ASME B30.5, a two crane lift is signaled by:
a. The main crane operator
b. The safety director
c. One designated person
d. The site engineer - ANSWER c. One designated person
12.In multiple crane lifts using an equalizer beam, the weight of the beam
should be considered:
a. Part of the crane boom
b. Part of the load weight
c. Part of the crane weight
d. A non-factor - ANSWER b. Part of the load weight
13.What is required if there is a deviation from the lift plan?
a. The supervisor's permission
b. The rigger's permission
c. A new lift plan
d. Mark ups on the existing lift plan - ANSWER c. A new lift plan