Geschreven door studenten die geslaagd zijn Direct beschikbaar na je betaling Online lezen of als PDF Verkeerd document? Gratis ruilen 4,6 TrustPilot
logo-home
Tentamen (uitwerkingen)

Ohio stationary steam engineer Actual Exam Newest Complete 100 Questions And Correct Detailed Answers| Already Graded A+

Beoordeling
-
Verkocht
-
Pagina's
59
Cijfer
A+
Geüpload op
09-05-2026
Geschreven in
2025/2026

Ohio stationary steam engineer Actual Exam Newest Complete 100 Questions And Correct Detailed Answers| Already Graded A+

Instelling
Ohio Stationary Steam Engineer
Vak
Ohio stationary steam engineer

Voorbeeld van de inhoud

Ohio stationary steam engineer Actual
Exam Newest Complete 100 Questions
And Correct Detailed Answers| Already
Graded A+


1. Combustion efficiency may be increased by _____ the primary air.
Answer: Preheating (preheated air improves combustion efficiency).

2. What is the purpose of cinder reinjection?
Answer: Increase efficiency (unburned carbon is returned to the furnace).

3. What is true about the dew point of flue gases?
Answer: Dew point is the temperature at which the gases will condense
(can cause corrosion).

4. What will not cause high stack temperatures?
Answer: A plugged dry pipe (dry pipe affects steam quality, not stack
temperature).

5. What is true about smoke?
Answer: Smoke consists of unburned hydrocarbons (incomplete
combustion).

6. What is used to reduce SO₂ emissions in coal-fired boilers?
Answer: Wet or dry scrubbers (remove sulfur dioxide from flue gas).

7. In a solid fuel-fired boiler, a gradual increase in flue gas exit
temperatures over a shift indicates the operator needs to _____.
Answer: Operate soot blowers (soot buildup insulates tubes, raising exit
gas temp).

,8. Which watertube boiler is the largest in size and steam-generating
capacity?
Answer: Utility watertube boiler (used in power plants, very high capacity).

9. The blowdown on a safety valve can be altered by changing the setting
of the _____.
Answer: Huddling ring (adjusts the blowdown – the difference between
popping and reseating pressure).

10. Copper and brass piping may be used for piping systems as long as the
temperature does not exceed ____.
Answer: 406°F (above this, strength drops significantly; some codes say
406°F max for copper/brass).

11. What is not measured in a 3-element feedwater system?
Answer: Drum pressure (3-element measures steam flow, feedwater flow,
and drum level).

12. If the flame in a gas-fired boiler is pulsating, how can the problem be
fixed?
Answer: Increase furnace draft (pulsation often due to draft imbalance or
improper air-fuel ratio).

13. Grindability of coal is an issue to be considered when operating which
kind of coal-burning equipment?
Answer: Ball-and-race pulverizer (grindability affects mill capacity and
power consumption).

14. When using an induced draft fan, where will the strongest negative
draft be found?
Answer: At the inlet of the ID fan (maximum suction point before gases are
discharged).

15. How do you bank a fuel oil-fired boiler?
Answer: Turn off the fuel and air supplies, then re-light the burner as
necessary to maintain a predetermined minimum steam pressure (banking
keeps the boiler warm for quick restart).

,16. What is true about the lubricating oil used in a steam turbine?
Answer: It must readily separate oil and water (turbine oil needs good
demulsibility to release condensed steam).

17. What supplies the oil to a large steam turbine during start-up?
Answer: Auxiliary oil pump (main oil pump is driven by the turbine shaft
and not turning at start-up).

18. What device prevents the over-travel of the governor linkage?
Answer: Dashpot (provides damping to prevent hunting and over-travel).

19. When taking a boiler out of service, what should you not do?
Answer: Close the vent (venting must remain open to prevent vacuum
collapse when cooling).

20. What type of turbine oil purification system removes a portion of the oil
and replaces it?
Answer: Makeup oil system (periodic replacement of a fraction of the oil
volume).

21. What type of steam turbine system has steam take-offs prior to the
condenser?
Answer: Extraction turbine (steam is extracted at intermediate pressures for
process or feedwater heating).

22. What pressure is the threshold for exhaust side protection?
Answer: 15 psi (exhaust pressure above 15 psi requires special safety
considerations; low-pressure boilers are ≤15 psi).

23. What grade of fuel oil can be ignited by an electric spark from
electrodes?
Answer: #2 fuel oil (light oil, low flash point, easily ignited by spark).

24. What is the cheapest, easiest form of water treatment?
Answer: Blowdown (removes concentrated impurities by dumping a
portion of boiler water).

, 25. How can temporary hardness be removed from water?
Answer: Either by heating the water or by softening the water (heating
precipitates calcium bicarbonate).

26. What pH value shows alkalinity?
Answer: 9 (pH above 7 is alkaline; 9 is moderate alkalinity).

27. High alkalinity can cause what boiler condition?
Answer: Caustic embrittlement (cracking of stressed metal due to
concentrated sodium hydroxide).

28. What condition caused by improper water treatment may be remedied
by maintaining proper alkalinity?
Answer: Foaming/carryover (proper alkalinity reduces surface tension and
foam formation).

29. What test is used to measure water hardness?
Answer: SOAP test (soap solution titration measures total hardness; also
EDTA titration but “soap test” is classic answer).

30. What water test uses a color comparison?
Answer: Phosphate test (colorimetric comparison using a color wheel or
comparator).

31. When must a boiler have 2 bottom blowdown valves?
Answer: If the pressure is higher than 100 psi (ASME and Ohio code require
two valves in series for pressures over 100 psi, or one slow-opening and
one quick-opening).

32. What is the maximum pressure for which a seatless type blowdown
valve can be used?
Answer: 450 psi (seatless valves like Y-globe or venturi designs are rated
up to 450 psi typical).

33. What system is directly piped into a boiler flash tank?
Answer: Continuous blowdown (bottom blowdown goes to blowdown
tank; continuous goes to flash tank for heat recovery).

Geschreven voor

Instelling
Ohio stationary steam engineer
Vak
Ohio stationary steam engineer

Documentinformatie

Geüpload op
9 mei 2026
Aantal pagina's
59
Geschreven in
2025/2026
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

$32.11
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Maak kennis met de verkoper
Seller avatar
janekiarie1
4.0
(1)

Maak kennis met de verkoper

Seller avatar
janekiarie1 Galen college of Nursing
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
2
Lid sinds
3 maanden
Aantal volgers
0
Documenten
404
Laatst verkocht
1 week geleden

4.0

1 beoordelingen

5
0
4
1
3
0
2
0
1
0

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen