What does OSHA Stand for? and what is its primary purpose? - CORRECT
| | | | | | | | | | | | |
ANSWER✔✔-Occupational Safety Health administration. OSHA primary purpose | | | | | | |
is worker safety and compensation
| | | |
Six safety items that should be in a trailer - CORRECT ANSWER✔✔-Lock (For
| | | | | | | | | | | | |
trailer), Fire extinguisher, Hard hats, PPE, First aid, Flash lights, CO detectors, extra
| | | | | | | | | | | |
peices of 5/8 Drywall boards,
| | | | |
How do you report Job related accident? - CORRECT ANSWER✔✔-Inform
| | | | | | | | | |
Production manager, Assess the scene and if needed call 911, access report on
| | | | | | | | | | | | |
CPE
If accident occurs when should it be reported? - CORRECT ANSWER✔✔-
| | | | | | | | | |
Immediately but within 24 hours | | | |
What type of contractor type are we? - CORRECT ANSWER✔✔-Controlling
| | | | | | | | |
Four common Safety violation for Excavation? - CORRECT ANSWER✔✔-1.
| | | | | | | | |
Watchmen / supervisor | |
2. Cave in protection
| | | |
3. hard hat / PPE
| | | |
4. Ladder / exit from trench must be every 25 ft
| | | | | | | | | |
,4 safety violation for Framing - CORRECT ANSWER✔✔-Fall protection, Steel Toed
| | | | | | | | | | |
boots (PPE ) Guard Rails and handrail installments must follow plans, Block
| | | | | | | | | | | |
Windows before installment, Fire extinguisher on site,
| | | | | |
4 Safety violation for electrical - CORRECT ANSWER✔✔-GFCI, Proper and up to
| | | | | | | | | | | |
date working electrical cords, hard hats, Effective lock out / tag out in place
| | | | | | | | | | | | |
4 Roofing violations - CORRECT ANSWER✔✔-fall protection, Hard hats, Tied off /
| | | | | | | | | | | |
Slide protection, PPE, Proper placement of shingles (more than 6 ft from edge)
| | | | | | | | | | | |
proper installation of temp heaters in my area - CORRECT ANSWER✔✔-1. Place 2
| | | | | | | | | | | | |
sheets of 4x4 (5/8) fire rated drywall below temp heater, if in basement not
| | | | | | | | | | | | | |
needed, install a Co detector near temp heater along with fire extinguisher, Make
| | | | | | | | | | | | |
sure block is installed at window to prevent cord from damage
| | | | | | | | | |
Right to know law - CORRECT ANSWER✔✔-Workers right to know of hazards,
| | | | | | | | | | | |
safety concerns, and chemicals associated on the job site
| | | | | | | |
Focused Inspections - CORRECT ANSWER✔✔-Important inspections that
| | | | | | |
inspectors will specifically look for in an audit or while surveying a job site
| | | | | | | | | | | | |
4 focused inspections for OSHA - CORRECT ANSWER✔✔-Struck by, Fall
| | | | | | | | | |
protection, Caught by excavations, and electrical
| | | | |
2 ways to protect rebar from being a hazard - CORRECT ANSWER✔✔-J hook the
| | | | | | | | | | | | | |
bars away from potential harzards, install tennis balls or rubber caps
| | | | | | | | | |
,3 approved methods of fall protections - CORRECT ANSWER✔✔-Safety harness
| | | | | | | | | |
(Tied off) / Guard rails, Safety nets
| | | | | |
6 violations for sub contractor fails to implement safety rules - CORRECT
| | | | | | | | | | | |
ANSWER✔✔-1. Verbal warning (documented) | | | |
2. internal training directed by NVR
| | | | | |
3. $100 fine
| | |
4. $250 fine
| | |
5. 3rd party training
| | | |
6. $500 fine
| | |
7. Meeting with production mangers and Regional manager (assess situation/
| | | | | | | | | |
termination)
Employee 4 violations to implement safety rules - CORRECT ANSWER✔✔-1.
| | | | | | | | | |
verbal warning | |
2. 30 days probation
| | | |
3. 6 month probation
| | | |
4. termination
|
Erosion and Sediment Control - CORRECT ANSWER✔✔-
| | | | | |
What is the EPA and what is the agency Primary purpose? - CORRECT
| | | | | | | | | | | | |
ANSWER✔✔-Enviromental Portection Agency / Primary purpose is protect | | | | | | | |
human health and enviroment by writing and enforcing regulations through laws
| | | | | | | | | |
, list 3 E/s documents find in Binder that must be recorded weekly - CORRECT
| | | | | | | | | | | | | |
ANSWER✔✔-1. bi weekly inspections | | | |
2. Lot ownership log
| | |
3. Corrective actions completed and created
| | | | |
What is super silt fence - CORRECT ANSWER✔✔-Stakes with filter fabric that have
| | | | | | | | | | | |
wire mesh attached to prevent from being dissmantled and reinforced for added
| | | | | | | | | | | | |
strength of sediment control | | |
What is a designated washout area? Describe proper installation of area? -
| | | | | | | | | | | |
CORRECT ANSWER✔✔-Concrete washout is where pump trucks and concrete
| | | | | | | | |
trucks, painters, drywall, brick and stone masons come to washout any excess
| | | | | | | | | | | |
chemicals to clean tools and vehicles. Must have temp drive, sf around the
| | | | | | | | | | | | |
perimeter of the washout, need 6 mil poly installed below 2-3 gravel and the
| | | | | | | | | | | | | |
concrete washout is delivered and resting on temp drive for easy access
| | | | | | | | | | |
2 proper materials needed for temp drive? - CORRECT ANSWER✔✔-2-3 gravel
| | | | | | | | | | |
and filter cloth minimum 30'
| | | |
T/F excess concrete should be disposed of at concrete washout out? - CORRECT
| | | | | | | | | | | | |
ANSWER✔✔-False
What should PJM do if inspector shows up on Job site for E/S - CORRECT
| | | | | | | | | | | | | | |
ANSWER✔✔-Contact production manager, ask if we can wait for PM and keep a | | | | | | | | | | | | |
running list and document in detail the report
| | | | | | |
Correct Answers
What does OSHA Stand for? and what is its primary purpose? - CORRECT
| | | | | | | | | | | | |
ANSWER✔✔-Occupational Safety Health administration. OSHA primary purpose | | | | | | |
is worker safety and compensation
| | | |
Six safety items that should be in a trailer - CORRECT ANSWER✔✔-Lock (For
| | | | | | | | | | | | |
trailer), Fire extinguisher, Hard hats, PPE, First aid, Flash lights, CO detectors, extra
| | | | | | | | | | | |
peices of 5/8 Drywall boards,
| | | | |
How do you report Job related accident? - CORRECT ANSWER✔✔-Inform
| | | | | | | | | |
Production manager, Assess the scene and if needed call 911, access report on
| | | | | | | | | | | | |
CPE
If accident occurs when should it be reported? - CORRECT ANSWER✔✔-
| | | | | | | | | |
Immediately but within 24 hours | | | |
What type of contractor type are we? - CORRECT ANSWER✔✔-Controlling
| | | | | | | | |
Four common Safety violation for Excavation? - CORRECT ANSWER✔✔-1.
| | | | | | | | |
Watchmen / supervisor | |
2. Cave in protection
| | | |
3. hard hat / PPE
| | | |
4. Ladder / exit from trench must be every 25 ft
| | | | | | | | | |
,4 safety violation for Framing - CORRECT ANSWER✔✔-Fall protection, Steel Toed
| | | | | | | | | | |
boots (PPE ) Guard Rails and handrail installments must follow plans, Block
| | | | | | | | | | | |
Windows before installment, Fire extinguisher on site,
| | | | | |
4 Safety violation for electrical - CORRECT ANSWER✔✔-GFCI, Proper and up to
| | | | | | | | | | | |
date working electrical cords, hard hats, Effective lock out / tag out in place
| | | | | | | | | | | | |
4 Roofing violations - CORRECT ANSWER✔✔-fall protection, Hard hats, Tied off /
| | | | | | | | | | | |
Slide protection, PPE, Proper placement of shingles (more than 6 ft from edge)
| | | | | | | | | | | |
proper installation of temp heaters in my area - CORRECT ANSWER✔✔-1. Place 2
| | | | | | | | | | | | |
sheets of 4x4 (5/8) fire rated drywall below temp heater, if in basement not
| | | | | | | | | | | | | |
needed, install a Co detector near temp heater along with fire extinguisher, Make
| | | | | | | | | | | | |
sure block is installed at window to prevent cord from damage
| | | | | | | | | |
Right to know law - CORRECT ANSWER✔✔-Workers right to know of hazards,
| | | | | | | | | | | |
safety concerns, and chemicals associated on the job site
| | | | | | | |
Focused Inspections - CORRECT ANSWER✔✔-Important inspections that
| | | | | | |
inspectors will specifically look for in an audit or while surveying a job site
| | | | | | | | | | | | |
4 focused inspections for OSHA - CORRECT ANSWER✔✔-Struck by, Fall
| | | | | | | | | |
protection, Caught by excavations, and electrical
| | | | |
2 ways to protect rebar from being a hazard - CORRECT ANSWER✔✔-J hook the
| | | | | | | | | | | | | |
bars away from potential harzards, install tennis balls or rubber caps
| | | | | | | | | |
,3 approved methods of fall protections - CORRECT ANSWER✔✔-Safety harness
| | | | | | | | | |
(Tied off) / Guard rails, Safety nets
| | | | | |
6 violations for sub contractor fails to implement safety rules - CORRECT
| | | | | | | | | | | |
ANSWER✔✔-1. Verbal warning (documented) | | | |
2. internal training directed by NVR
| | | | | |
3. $100 fine
| | |
4. $250 fine
| | |
5. 3rd party training
| | | |
6. $500 fine
| | |
7. Meeting with production mangers and Regional manager (assess situation/
| | | | | | | | | |
termination)
Employee 4 violations to implement safety rules - CORRECT ANSWER✔✔-1.
| | | | | | | | | |
verbal warning | |
2. 30 days probation
| | | |
3. 6 month probation
| | | |
4. termination
|
Erosion and Sediment Control - CORRECT ANSWER✔✔-
| | | | | |
What is the EPA and what is the agency Primary purpose? - CORRECT
| | | | | | | | | | | | |
ANSWER✔✔-Enviromental Portection Agency / Primary purpose is protect | | | | | | | |
human health and enviroment by writing and enforcing regulations through laws
| | | | | | | | | |
, list 3 E/s documents find in Binder that must be recorded weekly - CORRECT
| | | | | | | | | | | | | |
ANSWER✔✔-1. bi weekly inspections | | | |
2. Lot ownership log
| | |
3. Corrective actions completed and created
| | | | |
What is super silt fence - CORRECT ANSWER✔✔-Stakes with filter fabric that have
| | | | | | | | | | | |
wire mesh attached to prevent from being dissmantled and reinforced for added
| | | | | | | | | | | | |
strength of sediment control | | |
What is a designated washout area? Describe proper installation of area? -
| | | | | | | | | | | |
CORRECT ANSWER✔✔-Concrete washout is where pump trucks and concrete
| | | | | | | | |
trucks, painters, drywall, brick and stone masons come to washout any excess
| | | | | | | | | | | |
chemicals to clean tools and vehicles. Must have temp drive, sf around the
| | | | | | | | | | | | |
perimeter of the washout, need 6 mil poly installed below 2-3 gravel and the
| | | | | | | | | | | | | |
concrete washout is delivered and resting on temp drive for easy access
| | | | | | | | | | |
2 proper materials needed for temp drive? - CORRECT ANSWER✔✔-2-3 gravel
| | | | | | | | | | |
and filter cloth minimum 30'
| | | |
T/F excess concrete should be disposed of at concrete washout out? - CORRECT
| | | | | | | | | | | | |
ANSWER✔✔-False
What should PJM do if inspector shows up on Job site for E/S - CORRECT
| | | | | | | | | | | | | | |
ANSWER✔✔-Contact production manager, ask if we can wait for PM and keep a | | | | | | | | | | | | |
running list and document in detail the report
| | | | | | |