QUESTIONS WITH VERIFIED
ANSWERS
\.A BOM file is also called which of the following - ANSWERS✔-Product Tree
\.MRP stands for Material Requirements Planning - ANSWERS✔-True
\.A project can be subdivided into which of the following - ANSWERS✔-work
packages
\.MRP is most valuable where a number of products are made in batches using
the same productive equipment - ANSWERS✔-True
\.PERT is an abbreviation for which of the following methodologies - ANSWERS✔-
Program Evaluation and Review Technique
\.How many free trade zones are there in the US - ANSWERS✔-about 260
\.A master production schedule is an input to a material requirements planning
(MRP) system - ANSWERS✔-True
, \.An input to the material requirements planning (MRP) system is an exception
report - ANSWERS✔-False
\.Which of the following are eligible companies to be considered for the Baldrige
award - ANSWERS✔-auditing firms
\.An input to the material requirements planning (MRP) system is an inventory
records file - ANSWERS✔-True
\.MRP systems seek to achieve - ANSWERS✔-determine the number of dependent
demand items needed
\.A modular bill of materials includes items with fractional options - ANSWERS✔-
False
\.An analytical tool used in six-sigma quality improvement programs is which of
the following - ANSWERS✔-checksheets
\.In monitoring process quality we might use which of the following statistics -
ANSWERS✔-difference between the highest and lowest value in a sample
\.Quality of life in a host community is not a major factor in making the facility
location decision - ANSWERS✔-False