QUESTIONS AND ANSWERS
CERTIFICATION PAPER 2026 FULL
ANSWERS GRADED A+
⩥ CQC. Answer: contractor quality control
⩥ Superpave. Answer: Asphalt mix design system since 1998
⩥ QCP. Answer: Quality control plan
⩥ QCM. Answer: Quality control Manual
⩥ QC. Answer: Quality Control (Contracting Testing and Inspection)
⩥ VT. Answer: Verification Testing (FDOT or CEI Verification)
⩥ CEI. Answer: Construction Engineering and Inspection
⩥ RT. Answer: Resolution Testing (FDOT)
, ⩥ IV. Answer: Independent Verification Testing
⩥ IA. Answer: Independent Assurance Testing
⩥ The decision-making authority on a job needs to be given to who?.
Answer: Needs to be given to the level closet to the work as specified in
the specifications. It ensure a quick handle on situations and issues.
⩥ The governing order of project documents from high (1) to low (7)
starts with the highest being. Answer: Special Provisions
⩥ The governing order of project documents from high to low (2).
Answer: Technical Special Provisions
⩥ The governing order of project documents from high to low (3).
Answer: Plans
⩥ The governing order of project documents from high to low (4).
Answer: Road design, structures, and traffic operations standards
⩥ The governing order of project documents from high to low (5).
Answer: Developmental Specifications