A Latching relay: Used for call registration,direction selection Which relay do you need to Order
or as selector relays
Two types are: Set/Rest are electrical and Mechanical Latching 710 Pg, 7
relays
Need to know latching relay symbol, Its a box with shaded
triangle in lower right hand corner.
RPM = 60 ∙ ƒ ÷ P÷2 = Know the formula for RPM
Step 1. 60 x Frequency (Hz.) =
Step 2. Poles ÷ 2 = 435 Pg. 5
Take answer 1 and ÷ by answer 2 =
1/19
,3/25/26, 2:38 PM
If you are referring to a megohm meter, it is a test of the Know what a Megger is and what it does
insulation properties of such things as electric wiring, motor
windings and high power antenna mounts. 636 Pg. 13
We use a "megger" or "meg out" electrical wiring and
equipment to see if it is shorted to ground or the frame in any
way.
The megger uses much higher voltages to check resistance
than a normal Volt-ohm meter.
Minimum resistance is 1 Meg Ohm
(1) A parallel connection. (2) A resistive element placed across Shunt Overloads
the terminals of an armature to bypass a portion of the current.
(3) A flexible electrical conductor designed to conduct 425 All Pages
current around the mechanical joint between two conductors.
(4) The resistive element (Usually of very low resistance) used
in parallel with a DC ammeter movement to bypass a
calibrated portion of the total circuit current.
Bad Ground You are using a Temp Run Box and you get shocked! Why!
520 Pg. 4
The bridle hitch can consist of two,three, or four single hitches Bridal Hitch
(fig. 3-22), used together to form a bridle hitch for hoisting an
object 128 Pg 17
A sling with two legs used to lift a 1,000 pound object will have
500 pounds of the load on each leg when the sling angle is 90
degrees. The load stress on each leg increases as the angle
decreases; and if the sling angle was 30 degrees lifting the
same 1,000 pound object, the load will be 1,000 pounds on
each leg. Try to keep all sling angles greater than 45 degrees;
sling angles approaching 30 degrees are considered
extremely hazardous and must be avoided at all cost.
2/19
, 3/25/26, 2:38 PM
Scaffolding should be tied to the structure using Scaffolding, You have 32' of rise, you are using 3x5 scaffolding. Where will the tie off
#9 wire or tie-in devices. The first vertical tie points be ?
should be at the maximum height of 4 times the
narrowest base dimension. Additional ties are not 140 PG. 287-288
to exceed 26' vertically. Maximum horizontal
distance between ties is not to exceed 30'.
Counterweights (Typically) are hung to counter balance the How much should Counterweight way?
weight of the car PLUS 40% of Capacity Load.
240 Pg. 14
Note: We do not use wire smaller than #20 in travelling cables Pulling Spare Wires (Example) 10% of 52
Wires and #24 outside travelers.
Largest wires are feeders to Hoist /Pump motor 515 Pg.26
We always have 10 % spares
10% of 52 = 5.2
On a calculator Multiply the percent 10 by the number you
have and ÷ by 100
10 X 52 ÷ 100 = 5.2
The correct lube must be used on chains. The freight door motor is spinning but the door wont move, Why?
535 Pg. 9
Lula: Limited use/Limited Access (Example Wheelchair Lifts) Read Lula and Dumb waiters
Max Rise 25'
Max Speed 30 Ft/Min 545 Pg 1
Max Capacity 1400 Lbs.
Max Platform Area 18 Sq/Ft.
Residential Elevator:
Max Rise 50 '
Max Speed 40 Ft/min
Max Capacity 940 Lbs.
Max Platform Area 19 Sq/Ft
840 Pg 2
Dumbwaiters:
Platform limited to 9 Sq/Ft
Inside height is limited to no more than 4 Feet
Capacity is limited to 500Lbs
No Riders